• Sign up for the Daily Digest E-mail

BOE Report

  • Home
  • Headlines
    • Canada
    • USA
    • Columns
    • Discussions
  • Plays
    • Cardium Sandstone
    • Duvernay Shale
    • Montney Shale
    • Shaunavon
    • Viking Sandstone
    • Williston Basin
  • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Database
  • Markets
    • Canada Market Quotes
    • USA Market Quotes
    • Canada Well Licences
    • Canada Rig Count
    • USA Rig Count
    • USA Market Data
  • Advocacy
  • Data
  • Jobs

Kinder Morgan Announces Binding Open Season for Expansion of Mier-Monterrey Pipeline

July 28, 20158:30 AM Business Wire

HOUSTON–(BUSINESS WIRE)–A subsidiary of Kinder Morgan, Inc. (NYSE: KMI) today announced the start of a binding open season to solicit interest for incremental firm natural gas transportation service on its Mier-Monterrey pipeline, which would expand capacity to approximately 1.340 billion cubic feet per day. The expansion project, which would be completed by the fourth quarter of 2017, will consist of the looping of the existing Mier-Monterrey pipeline system from the Mexico-United States border to Huinalá, Nuevo León, Mexico, and a new lateral from Pesquería, Nuevo León, Mexico, to Escobedo, Nuevo León, Mexico.

“We received significant interest from our initial open season on this project as natural gas demand in Mexico continues to increase,” said Kinder Morgan Natural Gas Midstream President Duane Kokinda. “The proposed looping project utilizes and expands upon our existing assets to provide a low-cost option for additional capacity to transport natural gas produced in the United States to the growing industrial and power-generating markets in and around Monterrey, Nuevo León.”

The open season bid period begins on Aug. 13, 2015, and ends at 5 p.m. Central Time on Aug. 22, 2015. Interested parties should submit their written request for the Binding Bidding Guidelines to Alex Araya, director of marketing and transport for Kinder Morgan Midstream, at alex_araya@kindermorgan.com or (713) 369-8820. For more information on the open season, visit www.kindermorgan.com.

KMI subsidiary Kinder Morgan Gas Natural de México S. de R.L. de C.V. owns and operates the 85-mile Mier-Monterrey pipeline, which has been in service since 2003 and stretches from the International Border between the United States and Mexico in Starr County, Texas, to Monterrey, Mexico. The pipeline connects to a 1,000-megawatt power plant complex and to the Pemex natural gas transportation system.

Kinder Morgan, Inc. (NYSE: KMI) is the largest energy infrastructure company in North America. It owns an interest in or operates 84,000 miles of pipelines and 165 terminals. The company’s pipelines transport natural gas, gasoline, crude oil, CO2 and other products, and its terminals store petroleum products and chemicals, and handle bulk materials like coal and petroleum coke. Kinder Morgan is the largest midstream and third largest energy company in North America with an enterprise value of approximately $130 billion. For more information please visit www.kindermorgan.com.

Advisories & Contact
This news release includes forward-looking statements. These forward-looking statements are subject to risks and uncertainties and are based on the beliefs and assumptions of management, based on information currently available to them. Although Kinder Morgan believes that these forward-looking statements are based on reasonable assumptions, it can give no assurance that such assumptions will materialize. Important factors that could cause actual results to differ materially from those in the forward-looking statements herein include those enumerated in Kinder Morgan’s reports filed with the Securities and Exchange Commission. Forward-looking statements speak only as of the date they were made, and except to the extent required by law, Kinder Morgan undertakes no obligation to update or review any forward-looking statement because of new information, future events or other factors. Because of these uncertainties, readers should not place undue reliance on these forward-looking statements.

Kinder Morgan

Follow the BOE Report
  • linkedin
  • facebook
  • twitter
Sign up for the BOE Report Daily Digest E-mail
Latest Headlines
  • Oil rises 3% this week on OPEC supply cuts and US-China trade hopes
  • With politics at play, CAODC remains hopeful but not optimistic Trans Mountain Expansion Project (TMX) will proceed.
  • Canada Weekly Rig Count Down 12 to 212
  • A look at 16 new recommendations for Ottawa on the Trans Mountain pipeline
  • U.S. oil drillers cut rigs for first week in three

Return to home page
OSY Rentals

About
  • About BOEReport.com
  • In the News
  • Terms of Use
  • Privacy Policy
Resources
  • App
  • Widgets
  • Desktop
  • Daily Digest E-mail
Get In Touch
  • Advertise
  • Post an Announcement
  • Post a Job
  • Contribute
  • Contact
Featured In
  • CamTrader
  • Rigger Talk
BOE Network
Copyright © 2019 Grobes Media Inc.