CALGARY, Dec. 2, 2014 /CNW/ – Imperial today confirmed that bitumen production has ramped up to pre-shutdown levels at its Kearl operations following a precautionary shutdown in early November, prompted by the detection of a vibration issue with the plant’s ore-crusher unit.
SOURCE Imperial Oil Limited