BOSTON–(BUSINESS WIRE)–A new in-depth report analyzing energy reliability in New England during extreme winter conditions has concluded that the proposed electric ratepayer funding of additional pipeline capacity is a costly and risky proposition in terms of both ratepayer expense and a healthy energy market in New England. Energyzt Advisors, LLC, a global collaboration of energy experts, conducted the study after the record-breaking winter of 2014-2015, which actually saw a decrease in energy prices.
After several winters produced significant demand for energy in the region, Energyzt analyzed energy market conditions that occurred in New England and compared the costs, benefits, and market impacts of alternative proposals to address winter reliability. The report was commissioned by GDF SUEZ Energy North America to determine if the current plans to build new pipeline capacity funded by electricity ratepayers were really needed in New England.
Energyzt’s report, “Analysis of Winter Reliability Solutions for New England Energy Markets,” found that the existing energy infrastructure in New England is more than adequate to handle the region’s energy needs. The report stated that, “certain market participants have advocated for extraordinary government intervention to mandate regulated electric ratepayer funding of a new pipeline, implicitly claiming that high prices are signaling a shortage of pipeline delivery capability and a failure of the market to respond appropriately. Some have gone as far as to claim that New England gas and electric reliability are at risk. These claims are unsupported.”
The report further noted that, “the electricity system has maintained required reserve margins during some of the most extreme conditions over the past three winters despite numerous temporary system problems. The issue is not lack of infrastructure, but lack of commercial contracts to access existing energy infrastructure.”
The report presents analyses showing that proven and far less costly alternatives to a subsidized pipeline include liquefied natural gas (LNG) and dual-fuel capability. In addition to these existing energy assets, pipeline expansions already underway and ISO-NE’s market-based approach with its “Pay-for-Performance” in the Forward Capacity Market (FCM) can ensure winter reliability for at least the next decade under ISO-New England 2015 projections of load growth, generation additions and retirements. Existing policies in New England promoting demand response, energy efficiency and renewable energy additions limit projected growth in natural gas demand from the electricity sector over the long-term, a finding consistent with recent Annual Energy Outlook projections issued by the Energy Information Administration. Electricity ratepayers are not driving a need for additional pipeline capacity.
The report also highlighted other reasons why subsidized pipelines would be unnecessary and risky for energy consumers:
Click here for the Energyzt report.
GDF SUEZ Energy North America manages a range of energy businesses in the United States, Mexico, and Canada. These businesses include electricity generation and cogeneration, natural gas and liquefied natural gas (LNG) distribution and sales, and retail energy sales and related services to commercial, industrial, and residential customers. To learn more, please visit www.gdfsuezna.com.