• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Nexen shuts down Long Lake Upgrader, no set date for restart

July 12, 201611:38 AM BOE Report Staff0 Comments

Nexen Energy has shelved plans to restart a facility at an Alberta oilsands operation that was damaged in a fatal explosion earlier this year.

The company idled an upgrader at the Long Lake site after an explosion in January killed two people.

After a review, Nexen has concluded that a short-term repair for the upgrader is not feasible and therefore it is putting it into winter preservation mode with no date set for a restart.

Nexen says the explosion was the result of work being performed outside the scope of approved work activities.

The company has also finished an investigation into a pipeline leak last year that spilled about five million litres of bitumen, sand and produced water over a 16,000-square metre area.

The company concluded that the rupture happened on June 11 — about a month before it was discovered by a contractor — was a result of an incompatible pipeline design for the muskeg ground conditions.

With files from The Canadian Press

Nexen

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Pembina Pipeline Reaches Settlement With Shippers On Alliance Pipeline
  • Kiwetinohk announces upcoming second quarter 2025 earnings release
  • Athabasca Oil Announces 2025 Second Quarter Results Highlighted by Strong Operational Results, Continued Share Buybacks and a Pristine Financial Position
  • Ovintiv Reports Second Quarter 2025 Financial and Operating Results
  • Baytex Conference Call and Webcast on Second Quarter 2025 Results to Be Held on August 1, 2025

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.