• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

CER provides reasons for denial of NOVA Gas Transmission Ltd.’s firm-linked transportation service

March 23, 20226:05 AM Globe Newswire

CALGARY, Alberta – The Commission of the Canada Energy Regulator denied NOVA Gas Transmission Ltd.’s (NGTL) application for a proposed firm transportation linked service, and associated tolling methodology, from receipt points along the North Montney Mainline in Northeast B.C. to the proposed Willow Valley Interconnect delivery point. The Commission found that the tolling methodology would result in tolls that were not just and reasonable. The Commission approved NGTL’s request to designate the Willow Valley Interconnect delivery point as a Group 1 delivery point, citing the overall benefits to the designation.

On January 19, 2022, the Commission issued its decision with reasons to follow as NGTL requested an expedited decision.

In May 2021, NGTL applied to the CER for a new service for PETRONAS Canada Ltd. This service would link the North Montney Mainline and the Coastal GasLink pipeline (CGL) at the Willow Valley Interconnect delivery point. From here, natural gas would be transported on the CGL pipeline to the LNG Canada export terminal in Kitimat, B.C.

Tolls for the service were designed to cover only incremental costs and shifted the risk of cost overruns to other shippers on the NGTL System. The toll design did not satisfy the cost causation principle. This principle says that users of a pipeline system are responsible for the costs associated with transporting their product through the pipeline.

The Commission also decided there was insufficient information at this time to determine if the previously approved tolling methodology for the existing NGTL system would still be appropriate once gas deliveries began at the Willow Valley Interconnect. This decision does not impact the current tolling methodology for existing services on the North Montney Mainline.

Quick Facts

  • The CGL pipeline is under construction by TC Energy and is regulated by the British Columbia Oil and Gas Commission.
  • The Commission heard from 22 intervenors/participants in the hearing.
  • The CER is responsible for regulating tolls, tariffs, and traffic for pipelines that cross a provincial or international border.
  • The Canadian Energy Regulator Act says that tolls must be just and reasonable and not unjustly discriminatory – which generally means all shippers need to be treated fairly.
  • A toll is the price charged by a pipeline company for transportation and other services. Tolls help pipeline companies cover the costs to safely operate and maintain pipelines.

Associated Links

  • Decision (Folder C18621)
  • Project Background
  • Tolling Video
  • Pipeline Profiles NOVA Gas Transmission Ltd. (NGTL)

The Canada Energy Regulator (CER) works to keep energy moving safely across the country. We review energy development projects and share energy information, all while enforcing some of the strictest safety and environmental standards in the world. To find out how the CER is working for you visit us online or connect on social media.

Contact

Mireille Ferland
Communications Officer
Canada Energy Regulator
Email: mireille.ferland@cer-rec.gc.ca
Telephone: 403-390-8931
Telephone (toll-free): 1-800-899-1265

 

LNG Petronas TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Takeaways from Trump’s speech on Iran
  • Investor reactions to Trump’s speech on Iran war
  • Oil jumps over 4% after Trump says U.S. to keep up attacks on Iran
  • Venezuela’s oil exports surpassed 1 million bpd for the first in 6 months, shipping data shows
  • Discount on Western Canada Select widens

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.