
The work on the 183,000 barrel per day (bpd) refinery is expected to last until mid-October, the report added.
(Reporting by Rahul Paswan in Bengaluru Editing by David Goodman )
The work on the 183,000 barrel per day (bpd) refinery is expected to last until mid-October, the report added.
(Reporting by Rahul Paswan in Bengaluru Editing by David Goodman )