• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Australia LNG disruptions continue after Narelle, thousands without power

March 28, 20266:47 PM Reuters0 Comments

Australia’s liquefied natural gas production remained disrupted and thousands were without power in the remote northwest on Sunday, more than a week after the Narelle storm system hit the country.

The impact of Narelle, downgraded from a tropical cyclone on Saturday, on LNG plants run by Chevron and Woodside has exacerbated a global supply crunch caused by the month-old Iran war.

Australia became the world’s second-largest LNG exporter when Qatar halted production following damage from Iranian strikes.

Woodside Australia said on Sunday there was no update to the situation. Narelle was still interrupting production on Saturday at the company’s Karratha gas plant, the onshore processing facility for the North West Shelf project, while production was unaffected at its Macedon and Pluto facilities.

Chevron did not immediately respond to a request for comment on Sunday. On Saturday, it said it was working to restore production at its Gorgon and Wheatstone gas facilities following production outages due to Narelle.

Gorgon is Australia’s largest LNG export facility, producing 15.6 million metric tons a year with three processing trains, while Wheatstone has two trains producing 8.9 million tons.

Power remained cut late on Saturday in Exmouth, a town of 2,800 people some 1,100 km (700 miles) north of West Australia’s state capital Perth, the Department of Fire and Emergency Services said.

State-owned Horizon Power said extra crews were on their way to Exmouth “to support local crews to restore power to affected properties as soon as it is safe to do so”.

Exmouth, a gateway to the UNESCO World Heritage-listed Ningaloo Reef, suffered significant damage in the cyclone but no one was injured, the Australian Broadcasting Corp reported.

Narelle made landfall as a severe tropical cyclone in Queensland state on March 20 and crossed the Northern Territory before hitting Western Australia.

(Reporting by Sam McKeith in Sydney; Editing by William Mallard)

Chevron LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Pentagon preparing for weeks of ground operations in Iran, Washington Post reports
  • Australia LNG disruptions continue after Narelle, thousands without power
  • Stocks fall, oil prices rise on darkening economic outlook from Middle East war 
  • Iran says US attacks while calling for talks ‘intolerable’, response undecided
  • Oil, gas exploration is back: Energy giants hunt to replenish reserves

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.