• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

National Energy Board issues Board Order to TransCanada Keystone Pipeline GP Ltd.

May 24, 20162:36 PM CNW

CALGARY, May 24, 2016 /CNW/ – The National Energy Board (NEB) has issued a Board Order to TransCanada Keystone Pipeline GP Ltd. (Keystone) to ensure that environmental protection and mitigation measures continue on the Keystone XL project (Project) despite the US Department of State’s decision of November 3, 2015 to not issue a Presidential Permit to construct and operate the US section of the Keystone XL Pipeline.

During NEB inspections on the Keystone XL Pipeline Project in Alberta, the NEB observed that reclamation had not been completed at two Horizontal Directional Drill staging areas. These areas included a portion of the pipeline right-of-way and construction access roads at the Red Deer River and South Saskatchewan River crossings. At the time of the inspections, the NEB issued Notices of Non-Compliance related to erosion control and weed management, which required corrective actions.

When the Keystone XL project was approved on April 27, 2010, the NEB required completion of conditions at various stages during construction of the approved Project. The NEB Order requires Keystone to take precautionary measures necessary for protection of the environment.

NEB Order

The NEB Order requires the company to submit the following information with the Board by December 1, 2016:

  • Results of recent surveys of wildlife, vegetation, wetlands and weeds; including mitigation plans and evidence of consultation with provincial and federal authorities.
  • A report with prescribed reclamation scenarios to predict the effects on soil productivity.
  • An environmental monitoring report for the horizontal directional drill river crossings.
  • A report summarizing consultation  with relevant provincial and federal authorities regarding the status of construction of the Project to date and whether there are any outstanding issues or follow-up actions that may be required.
  • The Landowner Consultation Tracking Table.
  • An annual report regarding, among other things, the status of the Project.
Advisories & Contact
Associated Links

NEB Board Order

Quick Facts:

  • In 2015, the NEB conducted 142 inspections on regulated pipelines
  • In 2015, the NEB issued 24 Orders to regulated companies.

The National Energy Board is an independent federal regulator of several parts of Canada’s energy industry with the safety of Canadians and protection of the environment as its top priority. Its purpose is to regulate pipelines, energy development and trade in the Canadian public interest. For more information on the NEB and its mandate, please visit www.neb-one.gc.ca.                                

SOURCE National Energy Board

Keystone XL TransCanada

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US denies Iranian account that missile damaged F-16 over Gulf
  • Iran’s army says missile damaged US F-16 over Gulf, forcing emergency landing; no US confirmation
  • Bay du Nord oil project clears final regulatory hurdle, awaits Equinor’s next move
  • Canada’s Ensign plans to grow drilling rig fleet in Venezuela
  • Canada and Newfoundland and Labrador advance the Bay du Nord project

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.