• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Minnesota judge to rule on Enbridge Energy’s Line 3 project

April 23, 20189:47 AM The Associated Press0 Comments

Enbridge pipeline

MINNEAPOLIS – An administrative law judge faced a Monday deadline for recommending whether Minnesota regulators should approve Enbridge Inc.’s proposal for replacing its aging Line 3 crude oil pipeline across northern Minnesota.

The proposal has drawn strong opposition because the line would carry oilsands crude from Alberta across environmentally sensitive areas in the Mississippi River headwaters region where American Indians harvest wild rice and hold treaty rights.

Administrative Law Judge Ann O’Reilly’s report on whether the line is needed and whether it should follow the company’s preferred route or some alternative is expected to guide the Minnesota Public Utilities Commission when it makes its final decision in June. O’Reilly’s recommendations won’t be binding on the commission, but they’re the product of an extensive public hearing and comment process and voluminous filings, so they’ll be hard for the commissioners to disregard. Commission Chair Nancy Lange acknowledged at a hearing last month that whatever the commission decides, the dispute is likely to end up in court.

If the project is approved, some opponents have threatened a repeat of the protests in North Dakota near the Standing Rock reservation that delayed work for months on the Dakota Access pipeline, in which Enbridge owns a stake. Similar concerns over the role of oilsands crude in climate change, and Indigenous rights, have fuelled opposition to Kinder Morgan’s proposal to expand its Trans Mountain pipeline from Alberta to an export terminal in British Columbia.

Calgary-based Enbridge says the Line 3 project is necessary to ensure the reliable delivery of crude to Midwestern refineries. The company says the existing line, which was built in the 1960s, is subject to corrosion and cracking and can run at only half its original capacity because of its accelerating maintenance needs. The Jobs for Minnesotans coalition of business, labour and community leaders backs the project, saying it will create 8,600 well-paying jobs with a total economic impact on the state of US$2 billion.

Line 3 carries crude oil 1,097 miles (1,765 kilometres) from Hardisty, Alta., through North Dakota and Minnesota to Enbridge’s terminal in Superior, Wisconsin. Enbridge says the replacement would restore its original capacity of 760,000 barrels per day. Enbridge wants to replace the 282-mile (454 kilometre) stretch in Minnesota with a 337-mile (542 kilometre) pipeline following a partially different route. Enbridge estimates the cost of the project at $5.3 billion for the Canadian section and US$2.9 billion for the U.S. stretch.

Enbridge has already begun work in Canada and Wisconsin. Construction sites near Superior have been the scene of protests and several arrests.

Companies in this story: (TSX:ENB)

Enbridge Kinder Morgan Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Fuel markets flash supply crunch despite calmer oil prices
  • Carney pitches tighter Canada-Saudi mining and energy ties
  • Strategic oil reserve buying set to support crude demand through 2028
  • SECURE Stampede Charity Party Raises $840,000 For Four Community Organizations
  • US natgas prices fall to 6-week low on Freeport LNG maintenance, big storage build

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.