• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge takes steps on pipeline policy after BP complains

June 11, 20184:13 PM Reuters0 Comments

WINNIPEG, Manitoba (Reuters) – Canada’s biggest pipeline operator, Enbridge Inc, said on Monday it was taking steps to address complaints from oil shipper BP PLC about abrupt changes it made in allocating space on its Mainline system.

The company announced the policy change late last month before reversing it last week, after it caused panic among shippers and dramatically increased a discount on Canadian heavy crude.

Enbridge had intended to change how it verifies shippers’ oil supplies before dividing up capacity on the Mainline to prevent shippers from overestimating how much crude they had to move, a problem known as “air barrels.”

In a letter to Canadian regulator the National Energy Board (NEB), Enbridge said it would not use the revised system in August, and had no plans to do so thereafter.

The company also said, in response to BP’s concerns, that it would not implement any further changes during the trading period – the first three weeks of the month prior to shipment when sales and scheduling decisions are made. Enbridge said it would give shippers at least one calendar month’s notice of future changes.

Enbridge said in light of its actions, there should be no need for the NEB to continue a process of receiving industry feedback on the situation.

BP could not be immediately reached.

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Hormuz tanker crossings slip to lowest in more than two months, data shows
  • Middle East crude premiums surge, Asian refiners seeking alternatives
  • Trump vows to punish Iran and Houthis for attacks in Red Sea
  • Oil set for weekly rise amid Red Sea shipping attacks, Kazakhstan output cuts
  • Headwater Exploration Inc. announces second quarter operating and financial results and declares quarterly dividend

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.