• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Suncor raises Fort Hills mine costs, delays production ramp-up

July 29, 20219:11 AM Reuters0 Comments

Canadian oil sands producer Suncor Energy said on Thursday that work needed to stabilize a slope at its Fort Hills mine in northern Alberta will delay a ramp-up in production and add to cash operating costs.

The company discovered in July that it will need to change the slope of the south face of the mine to keep it stable. Suncor Chief Executive Officer Mark Little told an earnings call the slope is critically important, and will be a key permanent pillar between the Fort Hills mine and Suncor’s Aurora mine at its Syncrude project to the south.

“We don’t want it moving and becoming unstable. In a lot of places it’s not nearly as relevant, but this is a very critical piece of infrastructure going forward,” Little said.

The stabilization work means Suncor will delay ramping up Fort Hills production until the end of 2021. Output is expected to be 45,000-55,000 barrels per day this year, down from a previous forecast of 65,000-85,000 bpd and cash costs will rise to C$37-C$42 in 2021, up from a previous forecast of C$25-C$29 a barrel.

However the work will not impact Suncor’s long-term cash operating cost forecast, which is C$20 a barrel by 2040, Little said.

Fort Hills is an open-pit truck and shovel mine, where raw oil sands bitumen is extracted and then upgraded. Suncor is the majority-owner and operator of the mine, which started operating in 2018, in partnership with French oil major Total SE and Canadian mining firm Teck Resources.

Shares in Suncor, which reported on Wednesday a second-quarter profit due to higher crude prices, were last down 2.1% at C$25.18 on the Toronto Stock Exchange.

Canadian Oil Sands Suncor Syncrude

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran has not decided to resume US talks, says Hormuz shipping depends on US meeting conditions
  • Iran defiant on strait as Trump tells Americans to accept high gas prices
  • UAE’s ADNOC says one of its vessels came under attack while transiting Hormuz
  • Iran’s deputy foreign minister says won’t be intimidated by US threats after Trump’s statements on Hormuz
  • Peyto Exploration & Development Corp. Confirms Monthly Dividend for September 15, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.