• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Elcano Exploration Inc. – Receivership (SISP)

January 4, 20227:15 AM BOE Report Staff

ARCO Capital Partners Inc. (“ARCO”) has been engaged to assist Grant Thornton Limited, in its capacity as Court appointed receiver (the “Receiver”) of Elcano Exploration Inc., Elcano Exploration Ltd. and Elcano Energy Partnership (collectively, “Elcano” or “Company”), with the sale of Company’s light oil producing assets in Manitoba and non-producing interests in Alberta (the “Assets”) through a sale and investment solicitation process (the “SISP”) which was filed for approval on December 20, 2021.

Company and Asset highlights:

  • Consolidated working interest in North Hargrave and Miniota fields of southwest Manitoba
  • Light oil production of ~135 bbl/d from shallow 550 to 650 metre Lodgepole and Amaranth Formations (27o – 30o API)
  • Q4 2021E net operating income of $0.5 MM (~$40/bbl netback)
  • 24 MMbbl OOIP with 11% recovered to date vs 21% assigned by Sproule (P+P case; 28 locations)
  • Opportunity to optimize existing waterflood and improve sweep efficiencies and recovery
  • $3.4 MM of undiscounted future decommissioning obligation in Manitoba
  • 23 non-producing (22 abandoned) wells in Halkirk, Alberta with deemed liability of $0.47 MM and $0.25 MM deposit with the AER
  • $33.3 MM in tax pools as of December 31, 2020, including $16.0 MM of NCLs

The deadline for non-binding proposals is January 28, 2022, but such date may be subject to change by the Receiver.

Further details on the process can be found in the Information Memorandum or by contacting ARCO directly at https://arcocapital.ca/contact.

Property Listings

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US refiners can still absorb more Venezuelan crude, Energy Secretary Wright says
  • Iran deal very close, signing possible in coming days, US official says
  • US energy firms cut rigs for first time in eight weeks, Baker Hughes says
  • Tired of chaos, investors retreat from oil market at record pace
  • Lost Gulf oil exports far smaller than thought, traders and shippers say

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.