• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Jinzhou 9-3 Comprehensive Adjustment Project Commences Production

February 3, 20151:08 AM CNW

HONG KONG, Feb. 3, 2015 /CNW/ — CNOOC Limited (the “Company”, NYSE: CEO, SEHK: 00883, TSX: CNU) today announced that its Jinzhou 9-3 comprehensive adjustment project has commenced production.

The Jinzhou 9-3 oilfield is located in the North Liaodong Bay in Bohai with the water depth in the range of 6.5~10.5 meters. The main production facilities of this adjustment project include one central processing platform, one wellhead platform and 21 producing wells. There are currently 15 wells producing approximately 7,600 barrels of crude oil per day. The adjustment project is expected to reach its ODP designed peak production of approximately 12 thousand barrels per day in 2015.

The Jinzhou 9-3 is an independent oilfield in which the Company holds 100% interest and acts as the operator.

Notes to Editors:

More information about the Company is available at http://www.cnoocltd.com.

This press release includes “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995, including statements regarding expected future events, business prospectus or financial results. The words “expect”, “anticipate”, “continue”, “estimate”, “objective”, “ongoing”, “may”, “will”, “project”, “should”, “believe”, “plans”, “intends” and similar expressions are intended to identify such forward-looking statements. These statements are based on assumptions and analyses made by the Company in light of its experience and its perception of historical trends, current conditions and expected future developments, as well as other factors the Company believes are appropriate under the circumstances. However, whether actual results and developments will meet the expectations and predictions of the Company depends on a number of risks and uncertainties which could cause the actual results, performance and financial condition to differ materially from the Company’s expectations, including those associated with fluctuations in crude oil and natural gas prices, the exploration or development activities, the capital expenditure requirements, the business strategy, whether the transactions entered into by the Group can complete on schedule pursuant to its terms and timetable or at all, the highly competitive nature of the oil and natural gas industries, the foreign operations, environmental liabilities and compliance requirements, and economic and political conditions in the People’s Republic of China. For a description of these and other risks and uncertainties, please see the documents the Company files from time to time with the United States Securities and Exchange Commission, including the 2013 Annual Report on Form 20-F filed on April 17, 2014.

Consequently, all of the forward-looking statements made in this press release are qualified by these cautionary statements. The Company cannot assure that the results or developments anticipated will be realized or, even if substantially realized, that they will have the expected effect on the Company, its business or operations.

For further enquiries, please contact:

Ms. Michelle Zhang
Deputy Manager, Media / Public Relations
CNOOC Limited
Tel: +86-10-8452-6642
Fax: +86-10-8452-1441
E-mail: MR@cnooc.com.cn

Ms. Cathy Zhang
Hill+Knowlton Strategies Asia
Tel: +852-2894-6211
Fax: +852-2576-1990
E-mail: cathy.zhang@hkstrategies.com

Logo – http://www.prnasia.com/sa/200701301659.jpg

To view the original version on PR Newswire, visit:http://www.prnewswire.com/news-releases/jinzhou-9-3-comprehensive-adjustment-project-commences-production-300029760.html

SOURCE CNOOC Limited

CNOOC

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US energy firms add rigs for first time in four weeks, Baker Hughes says
  • White House weighs how to use Defense Production Act to expand US oil refining capacity, sources say
  • Kino Aski LNG and Naftogaz Group Explore Partnership to Supply Europe with Canadian LNG
  • QatarEnergy seeks US LNG deals through to 2031, sources say
  • Chevron CEO says depleted crude oil buffers could lead to higher prices

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.