• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge fixing Minnesota aquifer breach related to oil pipe construction

July 28, 20232:53 PM Reuters0 Comments

Enbridge Inc on Friday said it was working to fix an aquifer breach in rural Minnesota related to construction of its Line 3 oil pipeline replacement project, which was completed in 2021 and carries Canadian crude to U.S. refineries.

The Minnesota Department of Natural Resources (DNR) said this was the fourth aquifer breach related to the project.

“Through our ongoing investigation, including review of a series of groundwater reports that the DNR ordered, we have recently confirmed that there is a confined aquifer breach at the site,” the agency said in a statement.

The DNR said the groundwater flow at the surface from the latest aquifer breach near Swatara in Aitkin County is “considerably lower” than the flow observed at the other three breach sites.

Calgary-based Enbridge said the aquifer issues did not involve the pipe itself, nor drilling, but related to sheet metal piling typically used in construction to reinforce the trench for worker safety.

“Enbridge is providing a corrective action plan for this location as requested and will implement it upon approval,” company spokeswoman Juli Kellner said in an email.

Line 3 is a key part of Enbridge’s Mainline system, which ships the bulk of Canadian crude exports to the U.S., and carries 760,000 barrels per day to Midwest refineries.

(Reporting by Nia Williams; Editing by Marguerita Choy)

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Oil prices settle at lowest in over a week, as US pauses attacks on Iran
  • Gibson Energy Declares Dividend
  • Gibson Energy Reports Second Quarter 2026 Results, Highlighted by Record Infrastructure Adjusted EBITDA and Strategic Growth Execution
  • US natural gas prices fall 4% to 11-week low on record output
  • Oil stocks in US Strategic Petroleum Reserve fall by 3.7 million barrels to lowest level since 1983 

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.