• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

TC Energy’s Coastal GasLink pipeline fined for environmental non-compliance

September 21, 20235:01 PM Reuters0 Comments

British Columbia has fined Coastal GasLink, the natural gas pipeline being built by TC Energy, C$346,000 ($256,810) for non-compliance with environmental regulations, the Canadian province said on Thursday.

British Columbia’s Environmental Assessment Office fined Coastal GasLink C$340,000 for deficient erosion and sediment control measures, and a C$6,000 penalty for providing “false and misleading” information relating to maintenance inspection records.

The deficiencies were identified during four multi-day inspections along the pipeline construction route in April and May 2022.

“The reporting error was due to an administrative contractor record discrepancy that was provided to the EAO between October 2022 and January 2023,” Coastal GasLink said in a statement. “This was an unintentional and regrettable error.”

Coastal GasLink will connect gas fields in northwestern British Columbia with the Shell-led LNG Canada project, which will be Canada’s first liquefied natural gas project when it starts operating in the middle of this decade.

The fines are the latest in a series of financial penalties paid by the troubled project, totalling more than C$800,000.

The 670-km (416-mile) pipeline, co-owned with private equity firm KKR and Alberta Investment Management Corp, has been dogged by delays and rising costs.

It is 94% finished and scheduled for mechanical completion late this year, Coastal GasLink said. It is expected to cost C$14.5 billion, more than double the initial estimate.

(Reporting by Nia Williams Editing by Chris Reese and Deepa Babington)

LNG Shell TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Fuel costs on the rise as latest geopolitical turmoil drives up crude oil prices
  • Trump tells Axios he is considering restarting major combat operations in Iran
  • Global power demand to accelerate in 2026 and 2027, IEA says
  • Aramco offers more crude oil cargoes from Mediterranean amid Red Sea threats, sources say
  • Cutting off Red Sea oil route may be one crisis too many: Bousso

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.