• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

All crude units shut at TotalEnergies Texas refinery -sources

January 11, 20247:22 PM Reuters0 Comments

Both crude distillation units (CDUs) and two vacuum distillation units (VDUs) shut down on Thursday at TotalEnergies 238,000 barrel-per-day (bpd) Port Arthur, Texas refinery, sources familiar with plant operations said on Thursday.

The units, which convert crude oil into feedstock for all other units at the refinery, were shut following a malfunction on the gasoline-producing fluidic catalytic cracker (FCC), the sources said.

A TotalEnergies spokesperson did not reply a request for comment.

The 150,000-bpd ACU-1 CDU and 40,000-bpd ACU-2 as well as the 51,000-bpd VDU-1 and 60,000-bpd VDU-2 were shut after a malfunction on the 76,000-bpd FCC-2, the sources said.

In a notice filed with the Texas Commission on Environmental Quality (TCEQ) on Thursday, the company said the malfunction began Wednesday afternoon and continued till Thursday morning, during which steam use and production were reduced.

TotalEnergies also told the state pollution regulator FCC-2 returned to normal operation.

FCC-2 has struggled to reach full production since completing a three-month overhaul in late November, sources have told Reuters.

ACU-2 and VDU-1 remained shut into mid-December as FCC-2 was raising its production level.

The FCC-2 overhaul included replacement of the 1.3-million-pound (589.7 metric-ton) reactor on the unit.

(Reporting by Erwin Seba; Editing by Jacqueline Wong and Michael Perry)

TotalEnergies

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • Canada’s Suncor beats quarterly profit estimates on higher prices, refining margins
  • Discount on Western Canada Select widens
  • Pine Cliff Energy Ltd. Declares Monthly Dividend for August 31, 2026
  • Suncor Energy reports second quarter 2026 results

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.