• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US Army Corps targeting fall decision for Enbridge Line 5 tunnel

May 2, 20252:51 PM Reuters0 Comments

Mackinac Bridge spanning a frozen Straits of Mackinac in Michigan. The U.S. Army Corps of Engineers said on Friday it expects to make a decision this fall whether to grant a permit to Enbridge’s proposed Great Lakes tunnel for its Line 5 oil pipeline project.

The Army Corps, a federal engineering service, released an updated permitting timeline for the project that includes a 30-day public comment period from May 30 to June 3, followed by the decision in the fall.

The Army Corps has permitting authority over U.S. projects involving wetlands and waterways.

Last month, Enbridge’s Line 5 project received emergency designation after President Donald Trump declared a national energy emergency in a January executive order, giving the Army Corps the ability to fast-track its review of the project.

An Enbridge spokesperson said in an email on Friday the company is encouraged by the updated schedule.

“Enbridge submitted project permit applications for the Great Lakes Tunnel project to state and federal regulators in April 2020 — more than five years ago,” the spokesperson said.

The project would build a roughly 4-mile (6-km) tunnel for the 645-mile Line 5 that crosses through the Straits of Mackinac in the Great Lakes. The pipeline carries more than 20 million gallons of oil and natural gas liquids daily from Superior, Wisconsin, to Sarnia, Ontario.

Michigan regulators had approved Enbridge’s application to build the $750-million tunnel under the Great Lakes to house its aging Line 5 oil pipeline in 2023, but the project still awaits Army Corps permitting.

Native American tribes and environmental groups who oppose the project because of the potential risk to the Great Lakes have refuted the idea that the tunnel is needed and that a national energy emergency exists.

(Reporting by Amanda Stephenson in Calgary and Valerie Volcovici in Washington Editing by Rod Nickel)

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Cavvy Energy Releases Q2 2026 Financial and Operating Results, Provides Operational Update, and Increases 2026 Guidance
  • New oil and gas jobs from BOE Report Jobs
  • Peyto Reports Second Quarter 2026 Results
  • Bonterra Energy Announces Second Quarter 2026 Results and Operations Update
  • Stampede Drilling Inc. confirms it has no drilling rig in Greenland

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.