• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US Congress passes bill to speed approval of Keystone pipeline

May 23, 20136:57 AM BOE Report Staff

keystone xlBy Associated Press

WASHINGTON — House Republicans pushed through a bill Wednesday to bypass the president to speed approval of the Keystone XL oil pipeline from Canada to Texas. Democrats criticized the legislation as a blatant attempt to allow a foreign company to avoid environmental review.

The bill was approved, 241-175, largely along party lines.

Republicans said the measure was needed to ensure that the long-delayed pipeline, first proposed in 2008, is built.

“This is the most studied pipeline in the history of mankind,” said Rep. Lee Terry, R-Neb., the bill’s sponsor.

“When is enough enough?” added Rep. Jeff Denham, R-Calif. “Five years? Six years? Ten years?”

But Rep. Raul Grijalva, D-Ariz., called the bill a “reckless attempt to avoid environmental review.” The bill would deem the project approved without a presidential permit, as required under current law, and with no further environmental review. The legislation also would limit legal challenges to the project.

The White House says President Barack Obama opposes the bill because it would “circumvent longstanding and proven processes” by removing the requirement for a presidential permit.

The $7 billion pipeline, proposed by Calgary-based TransCanada, would carry oil extracted from tar sands in western Canada to refineries along the Texas Gulf Coast. The 1,700-mile pipeline would travel though Montana, South Dakota, Nebraska, Kansas and Oklahoma on its way to refineries in Houston and Port Arthur, Texas.

Supporters say the pipeline would create thousands of jobs, help lower fuel prices and bolster North American energy resources.

Opponents call the project a “carbon bomb” that would carry “dirty oil” that could trigger global warming. They also worry about a spill. Converting tar sands into oil can uses as much as 15 percent more energy than conventional oil production.

Obama has twice thwarted the pipeline project amid concerns about a proposed route through environmentally sensitive land in Nebraska, even as the White House approved a southern portion of the project from Oklahoma to Texas. The bill approved by the House would apply to an 875-mile portion of the pipeline from Canada to Nebraska.

The State Department, which has completed more than 15,000 pages of environmental review on the proposed pipeline over the years, said in a draft report this spring that the project was unlikely to cause significant environmental impact to most resources along the planned route. The report also said other options to move the oil from Canada to Gulf Coast refineries, such as trucks or rail cars, would be far worse for climate change.

The State Department expects to issue a final report this summer. The department has authority over the pipeline because it crosses a U.S. border.

This latest attempt to speed the pipeline marks at least the fourth time the House has tried to do so.

Rep. Fred Upton, R-Mich., defended the House actions, even though the Keystone bill is unlikely to be taken up by the Democratic-controlled Senate.

“There may be a few of my colleagues who are tired of Keystone bills, but the American people are also tired — tired of $3.70 a gallon gasoline, tired of unemployment above 7 percent, and tired of four years of delays that continue to block this critical jobs and energy project,” Upton said.

Keystone XL TransCanada

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Suncor says fire that occurred at its Sarnia site has been extinguished
  • Oil shipments rise in Hormuz although questions grow over Iran’s transit terms
  • Iran says it plans meeting with US officials in coming days after postponing Friday talks
  • Brent physical, paper prices slip further as Hormuz flows rise, traders say
  • Asia spot LNG at four-month low as Hormuz flows restart, upside risk remains

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.