• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Pre-existing Defect a Central Factor in 2012 Pipeline Explosion in British Columbia

June 4, 201311:34 AM CNW

GATINEAU, QC, June 4, 2013 /CNW/ – The Transportation Safety Board of Canada (TSB) has concluded in its investigation report (P12H0105) that a pre-existing flaw in the pipe was the primary cause of a Westcoast Energy Inc. pipeline explosion that occurred on 28 June 2012, approximately 40 km northwest of Buick, British Columbia.

On 28 June 2012, the 16-inch Nig Creek pipeline ruptured; gas escaping from the ruptured pipeline ignited, and the resulting fire spread to the surrounding forested area. Approximately 25 minutes later, the 6.625-inch Bonavista Energy Corporation pipeline, located 3 meters away in the same right-of-way, ruptured due to its exposure to the fire, and the escaping gas also ignited.

The TSB investigation found that certain types of pipe welded using a low-frequency electric resistance welding technique have an increased likelihood for the presence of defects such as cracks, and that this increases the risk that the pipe might fail. Following the accident, the National Energy Board directed Westcoast to conduct necessary integrity assessments and repairs prior to seeking approval to return the pipeline into service.

Since the accident, Westcoast Energy Inc. has taken a number of actions aimed at ensuring the integrity of its pipeline. It has conducted a successful pressure test on the entire Nig Creek pipeline, and filed a monitoring and verification plan for the pipeline’s fitness for service with the National Energy Board. It has also commissioned additional metallurgical analysis of other segments of the pipeline and scheduled an extensive inspection of the pipeline from the inside. Further, the company has begun a pipeline control room management review. It is anticipated that the resulting changes will improve response times during an emergency.

The TSB is an independent agency that investigates marine, pipeline, railway and aviation transportation occurrences. Its sole aim is the advancement of transportation safety. It is not the function of the Board to assign fault or determine civil or criminal liability.

SOURCE: Transportation Safety Board of Canada

For further information:

 

Transportation Safety Board of Canada
Media Relations
819-994-8053

Bonavista Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • UAE stresses Hormuz security in rare call with Iran after war tensions
  • Barclays cuts Brent price forecasts for 2026 and 2027
  • Ukraine attacks Russian energy sites — What has been hit?
  • Traffic through Strait of Hormuz slows after attack on ship
  • Iran insists on right to control shipping in Strait of Hormuz after ship hit near Oman

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.