• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Report: Pipe pinch threatens services sector

June 17, 201311:13 AM BOE Report Staff

oil drillersCP

 

CALGARY – The Conference Board of Canada says uncertainty over new pipeline projects poses a threat to Canadian companies that provide services to oil and gas producers.

The Ottawa-based think-tank predicts the sector’s real economic output this year will drop slightly by $60 million, or half a per cent, to $11.55 billion.

It says some of that is due to a lingering weakness in natural gas prices and a levelling off in conventional oil drilling.

But the board says the “bigger threat” is the lack of pipeline capacity, as environmental opposition and political wrangling throws the fates of projects such as Keystone XL into question.

The report says the current pipeline system will run out of room in the next few years, and delays in building new capacity could cause producers to pull back on their investment plans.

That would limit the need for support services such as drilling — a sector that represents nearly 112,000 jobs, just a bit less than the extraction industry itself.

A bullish forecast by the Canadian Association of Petroleum Producers earlier this month predicted a doubling in Canadian oil production by 2030, despite the pipeline delays, as alternatives such as rail transport fill the gap in the short term.

Keystone XL

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran insists on diplomatic solution after Trump rejects peace plan
  • Saudi Aramco is working with Evercore on gas unit plans, Bloomberg News reports
  • Trump predicts Cuba and US will make a deal
  • Venezuela president returns from US visit with no deals, no firm election date
  • Saudi says it intercepted 2 drones launched by Houthis towards Riyadh

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.