• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge Restarts Wood Buffalo Pipeline

July 2, 20137:31 AM Marketwired

CALGARY, ALBERTA–(Marketwired – July 2, 2013) – Enbridge Inc. (TSX:ENB) (NYSE:ENB) today confirmed the return to service of the Wood Buffalo Pipeline (Line 75) between Fort McMurray and Cheecham early on July 2. The Wood Buffalo Pipeline had been shut down as a precaution following the June 22 release of light synthetic crude oil from Line 37 with which it shares a corridor. The failure of Line 37 was confirmed to have been caused by a 1-in-100 year rainfall event last week, which triggered ground movement on the right-of-way. The Wood Buffalo Pipeline has been restarted at reduced pressure pending completion of further geotechnical analysis in the incident area.

The Woodland Pipeline (Line 49) in the same corridor between Fort McMurray and Cheecham has been in the process of line fill upstream from the site of the incident. Line fill activities continue in preparation for full start up.

As announced July 1, the northern segment of the Athabasca Pipeline is now operating at reduced pressure from Fort McMurray to Cheecham, and normal pressure on the southern segment from Cheecham to Hardisty. The Wood Buffalo Pipeline connects at Cheecham with the Waupisoo Pipeline (Line 18), which runs from Cheecham to Edmonton; the Waupisoo Pipeline was returned to service at normal pressure on June 25.

About Enbridge Inc.

Enbridge Inc., a Canadian company, is a North American leader in delivering energy and one of the Global 100 Most Sustainable Corporations. As a transporter of energy, Enbridge operates, in Canada and the U.S., the world’s longest crude oil and liquids transportation system. The Company also has a significant and growing involvement in natural gas gathering, transmission and midstream businesses, and an increasing involvement in power transmission. As a distributor of energy, Enbridge owns and operates Canada’s largest natural gas distribution company, and provides distribution services in Ontario, Quebec, New Brunswick and New York State. As a generator of energy, Enbridge has interests in more than 1,600 megawatts of renewable and alternative energy generating capacity and is expanding its interests in wind and solar energy and geothermal. Enbridge employs approximately10,000 people, primarily in Canada and the U.S. and is ranked as one of Canada’s Greenest Employers, and one of the Top 100 Companies to Work for in Canada. Enbridge’s common shares trade on the Toronto and New York stock exchanges under the symbol ENB. For more information, visit www.enbridge.com.

Certain information provided in this news release constitutes forward-looking statements. The words “anticipate”, “expect”, “project”, “estimate”, “forecast” and similar expressions are intended to identify such forward-looking statements. Although Enbridge believes that these statements are based on information and assumptions which are current, reasonable and complete, these statements are necessarily subject to a variety of risks and uncertainties pertaining to operating performance, regulatory parameters, weather, economic conditions and commodity prices. You can find a discussion of those risks and uncertainties in our Canadian securities filings and American SEC filings. While Enbridge makes these forward-looking statements in good faith, should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary significantly from those expected. Except as may be required by applicable securities laws, Enbridge assumes no obligation to publicly update or revise any forward-looking statements made herein or otherwise, whether as a result of new information, future events or otherwise.

Enbridge Inc.
Glen Whelan
Media
403-508-6563 or (888) 992-0997
glen.whelan@enbridge.com

Enbridge Inc.
Jody Balko
Investment Community
403-231-5720
jody.balko@enbridge.com

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Blackstone to Invest More Than $25 Billion in Pennsylvania’s Digital and Energy Infrastructure, Plus Catalyze an Additional $60 Billion Investment
  • Venture Global proposes larger expansion at Plaquemines LNG facility, filing shows
  • Ex-Pioneer CEO cannot challenge order barring him from Exxon board, FTC says
  • SLB’s ChampionX deal clears final hurdle with UK approval
  • Blackstone to invest $25 bln in data centers and natural gas plants, COO says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.