• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

RMP Energy Provides Ante Creek Drilling Results

November 26, 20133:38 PM Marketwired

CALGARY, ALBERTA–(Marketwired – Nov. 26, 2013) – RMP Energy Inc. (“RMP” or the “Company“) (TSX:RMP) is pleased to provide completion results from recent Ante Creek drilling activity. In the fourth quarter, RMP successfully drilled and completed two additional, 100% working interest Montney formation horizontal oil wells located at 1-25-66-24W5M and 4-26-66-24W5M. Both wells underwent successful 23 stage hydraulic fracture stimulations. Results are as follows:

  • The 1-25 well recovered all of the fracture stimulation fluid during the initial 64 hour flow back. During the extended 64 hour production test, after recovering the fracture fluid, the 1-25 well produced 6,180 bbls of 35 degree API light oil for an average daily rate of approximately 2,320 bbls/d and 1.6 MMcf/d of associated solution gas for an oil equivalent rate of 2,580 boe/d. The 1-25 well flowed at an average surface wellhead pressure of 3,500 Kpa (508 psi). Please refer to important Reader Advisories at the end of this news release.
  • The 4-26 well recovered all of the fracture stimulation fluid during its initial 64 hour flow back. During the 29 hour production test, after recovering the fracture fluid, the 4-26 well produced 1,500 bbls of 35 degree API light oil for an average daily rate of approximately 1,240 bbls/d and 2.6 MMcf/d of associated solution gas for an oil equivalent amount of approximately 1,675 boe/d. The 4-26 well flowed at an average surface wellhead pressure of 5,200 Kpa (754 psi). Please refer to important Reader Advisories at the end of this news release.

RMP has now successfully drilled and completed a total of eight (8.0 net), high rate Montney horizontal oil wells in the Ante Creek area. The Company’s Ante Creek field is currently production restricted due to third-party constraints on existing gas processing infrastructure. Consequently, only three wells are presently producing at restricted rates with wellhead chokes and no artificial lift support. In order to alleviate the gas capacity constraints, RMP is presently installing a pipeline inter-connect between its Ante Creek and Waskahigan properties and is expanding its Ante Creek surface field facilities to facilitate increased solution gas handling to 22 MMcf/d and oil handling capacity through the oil pipeline to about 10,000 bbls/d. Barring any unforeseen delays, the pipeline inter-connect and related field equipment expansion is scheduled to be in-service by the end of February 2014.

At Ante Creek, RMP has a significant asset ‘footprint’ in the area and holds 36.75 gross sections (35.72 net) of land.

Abbreviations
bbl barrel Mcf/d thousand cubic feet per day
Mbbl thousand barrels MMcf/d million cubic feet per day
bbls/d barrels per day MMcf Million cubic feet
boe barrels of oil equivalent Bcf billion cubic feet
Mboe thousand barrels of oil equivalent psi pounds per square inch
boe/d barrels of oil equivalent per day kPa kilopascals
NGLs natural gas liquids WTI West Texas Intermediate

Reader Advisories

Any references in this news release to initial and/or final raw test or production rates and/or”flush” production

Pages: 1 2

RMP Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select widens
  • European Commission proposes Russian oil price cap 15% below global price
  • US oil/gas rig count down for 11th week to lowest since 2021, Baker Hughes says
  • Taiwan’s CPC Corp eyes US shale gas assets, sources say
  • Saudi Arabia complying fully with voluntary OPEC+ target, energy ministry says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.