• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Altima Announces Drilling and Pipeline Construction at Chambers, Alberta With Whistler Oil and Gas Pty. Ltd.

January 21, 20144:00 AM Marketwired

VANCOUVER, BRITISH COLUMBIA–(Marketwired – Jan. 21, 2014) – Altima Resources Ltd. (TSX VENTURE:ARH)(PINKSHEETS:ARSLF)(FRANKFURT:AKC) announces that together with its joint venture partner Whistler Oil and Gas Pty. Ltd. (“Whistler”) (see Dec.13/13 press release), Altima and Whistler have licensed two new vertical wells in the Chambers-Ferrier area project, Alberta, Canada.

The 5-35-41-11 W5M well and 9-35-41-11 W5M well (the “Wells”) are offsets to the 15-35-41-11 W5M well that Altima drilled with Whistler and placed on stream on September 3, 2013 (see Sept.5/13 press release). The Wells will be drilled vertically to an approximate depth of 3,100 meters, and are expected to encounter multiple prospective horizons, including the productive zones in the 15-35 well.

Production from the Wells will flow through a 1.4 km pipeline to be constructed from the 5-35 well and tie into Altima’s existing 6.4 km pipeline that connects to the Baytex compressor station located at 4-4-42-10 W5M. From the Baytex compressor, gas and liquids will be routed through the Keyera North Strachan Gas Gathering System to the sales point at the Keyera deep cut gas facility located at 11-35-37-9 W5M.

Rick Switzer, President and CEO of Altima, confirmed that construction of the drilling leases and access road will commence the last week of January, with spud of the 5-35 well targeted for the first week of February. The 9-35 well is anticipated to be drilled immediately after rig release of the 5-35 well.

Mr. Switzer commented: “We are very pleased with our ongoing relationship with Whistler Oil and Gas Pty. Ltd. Last year we drilled the 15-35 well with Whistler and followed up with the 50/50 purchase of six additional sections adjacent and to the north of section 35. We also will construct the new pipeline under the earning arrangement with Whistler, and barring logistical or weather delay anticipate the new wells will be on production in Q2 2014.”

Richard Switzer, CEO, President and a Certified Professional Geologist, is the Qualified Person under National Instrument 51-101 responsible for preparing and reviewing the data contained in this press release.

ON BEHALF OF THE BOARD

Joe DeVries, Director

Advisories & Contact
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s plans or expectations include risks relating to: availability of capital and financing required to continue the Company’s exploration and development plans; general economic, market or business conditions; the actual results of current and planned exploration activities; fluctuating commodity prices; risks associated with property option agreements, leases, joint ventures and the ability to conclude joint venture agreements on favorable terms; possibility of accidents, equipment breakdowns and delays during exploration; exploration cost overruns or unanticipated costs and expenses; regulatory changes and restrictions including in relation to environmental liability; timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

Altima Resources Ltd.
Joe DeVries
Director
(604) 336-8610
(604) 718-2808 (FAX)
www.altimaresources.com

Altima Resources

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Israel preparing for attacks on Iranian energy sites, awaits US green light, official says
  • Iran says Iraq exempt from any Strait of Hormuz restrictions
  • India makes first Iranian oil buy in seven years with no payment problems
  • Five EU countries call for windfall tax on energy companies
  • Iran allows essential goods vessels to its ports via Hormuz strait, Tasnim says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.