• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Production from Kearl expansion project begins ahead of schedule

June 16, 20155:55 AM CNW

  • All three froth trains operational; doubles overall Kearl production capacity
  • Project captured efficiencies, lessons learned from initial development
  • Incorporates technologies to significantly enhance environmental performance

CALGARY, June 16, 2015 /CNW/ – Imperial today announced the successful startup of the Kearl oil sands expansion project, with all three froth trains operational. Production from the expansion project is expected to ultimately reach 110,000 barrels per day, bringing total production from Kearl to 220,000 barrels per day*.

“Startup of the Kearl expansion project was achieved with a disciplined focus on safety, project management and operational excellence,” said Rich Kruger, Imperial chairman and CEO. “Completed ahead of schedule, the project benefited significantly from Imperial’s ‘design-one/build multiple’ approach, ExxonMobil’s expertise in project planning and execution, strong relationships with Alberta-based contractors, and lessons learned from the Kearl initial development.”

“The overall Kearl development represents the next generation of oil-sands mining,” said Kruger. “Using Imperial’s proprietary paraffinic froth treatment process, we eliminated the need for an onsite upgrader, significantly reducing greenhouse-gas emissions. Specifically, on a well-to-wheels basis, Kearl diluted bitumen has about the same greenhouse-gas emissions footprint as the average crude refined today in the United States. Energy consumption has also been reduced by installing electrical cogeneration technology.”

Other environmental innovations include on-site water storage to eliminate withdrawals from the Athabasca River in low-flow periods, progressive land and tailings reclamation, and a state-of-the-art waterfowl deterrent system.

Construction of the Kearl expansion involved 33 million work hours and employed a peak workforce of more than 5,000 people. The project team and construction workforce achieved industry-leading safety performance. Of the project’s approximately $9 billion investment, 90 percent was spent with Canadian companies based in Alberta.  Nearly $500 million was directed to local suppliers and contractors in the Wood Buffalo region, of which about 25 percent are Aboriginal-owned and operated.            

The Kearl initial development commenced production in April 2013. Kearl bitumen production has been processed in more than 25 refineries throughout North America and elsewhere in the world. Located about 75 kilometres northeast of Fort McMurray, Alberta, Kearl is expected to recover approximately 4.6 billion barrels of bitumen over an estimated project life of more than 40 years.

*156,000 barrels Imperial’s share

After more than a century, Imperial continues to be an industry leader in applying technology and innovation to responsibly develop Canada’s energy resources. As Canada’s largest petroleum refiner, a major producer of crude oil and natural gas, a key petrochemical producer and a leading fuels marketer from coast to coast, our company remains committed to high standards across all areas of our business.  

SOURCE Imperial Oil Limited

Image with caption: “Imperial’s Kearl oil sands operation (CNW Group/Imperial Oil Limited)”. Image available at: http://photos.newswire.ca/images/download/20150616_C4903_PHOTO_EN_18123.jpg

For further information: Meredith Milne – 587-476-4743, Investor Relations; Pius Rolheiser – 587-476-7010, Public and Government Affairs

Exxon Mobil Imperial Oil

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • Hemisphere Energy Announces Normal Course Issuer Bid Renewal
  • Trump says US to impose 50% tariff on copper imports, copper futures jump
  • Canada maps out widening strait to LNG riches
  • Discount on Western Canada Select narrows

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.