• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

CORRECTION: SC Klaipedos Nafta preliminary transhipment and revenue results for the July 2015

August 5, 20157:52 AM Globe Newswire

During July 2015 SC Klaipedos nafta (hereinafter – “the Company”) reloaded 549 thousand tons of petroleum products into its storage tanks of Klaipeda oil terminal and Subacius fuel base (SFB), i.e. greater by 3.8 percent compared to July 2014, when 529 thousand tons were reloaded.

Totally during the first seven month of 2015 the Company reloaded 3,877 thousand tons of petroleum products into its storage tanks, greater by 28 percent compared to the same period of 2014 when 3,028 thousand tons were reloaded. The main reason for the transhipment volume growth in 2015 is the larger volume of petroleum products delivered both from SC Orlen Lietuva refinery and from Belarus refineries.

During July 2015 in the Liquefied Natural Gas (LNG) Terminal of the Company 326 thousand MWh (total during the first seven months of 2015 – 2,966 thousand MWh) of the natural gas were re-regasified and supplied to the natural gas transmission system (this activity started to be carried out on 27 November 2014).

The preliminary sales revenues of the Company’s Oil terminal and Subacius fuel base for July 2015 comprise EUR 3.1 million (LTL 10.7 million); greater by 14.8 percent compared to July 2014 (i.e. EUR 2.7 million or LTL 9.3 million).

The preliminary sales revenues of the Company’s LNG Terminal for July 2015 comprise EUR 5.4 million (LTL 18,6 million), which is equal to the one twelfth of the sum of necessary LNG Terminal operation costs and return on investments into LNG Terminal infrastructure for the year 2015, approved by the National Commission for Energy Control and Prices.

The preliminary sales revenues for the first seven months 2015 of SC Klaipedos Nafta oil terminal and SFB comprise EUR 24.6 million (LTL 84.9 million) and are greater by 26.8 percent compared to the same period of 2014 (EUR 19.4 or LTL 67.0 million).

Total preliminary revenue revenues for the first seven months of 2015 of the Company comprise EUR 62.4 million (LTL 215.5 million) while for the same period of 2014 it comprised EUR 19.4 million (LTL 67.0 million).

         Marius Pulkauninkas, Director of Finance and Administration Department, tel. 8 46 391763

LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select widens
  • European Commission proposes Russian oil price cap 15% below global price
  • US oil/gas rig count down for 11th week to lowest since 2021, Baker Hughes says
  • Taiwan’s CPC Corp eyes US shale gas assets, sources say
  • Saudi Arabia complying fully with voluntary OPEC+ target, energy ministry says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.