• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Primeline Commenced Drilling of LS30-3-1 Well

November 16, 20155:00 AM Marketwired

HONG KONG, CHINA–(Marketwired – Nov. 16, 2015) –

NOT FOR DISTRIBUTION TO U.S. NEWS WIRES SERVICES, OR DISSEMINATION IN THE UNITED STATES.

Primeline Energy Holdings Inc. (“Primeline” or the “Company“) (TSX VENTURE:PEH) today announces that it has commenced the drilling operations of the LS30-3-1 well.

Following the plug and abandon operation of LS23-1-1 announced on October 28, Primeline’s contractor, China Oilfield Service Ltd. (“COSL”), towed the rig HYSY 941 to the LS30-3-1 location on November 4 and successfully jacked up the rig on location on November 7. COSL subsequently completed all the necessary preparation work and Primeline obtained the operation licence. LS30-3-1 well was then spudded on November 13 and drilling is ongoing.

LS30-3-1 is located approximately 20km north of the LS36-1 gasfield platform and is targeting a large channel sand prospect. The planned total depth of the well is 1,800m, targeting the same reservoir as that of the LS36-1 gasfield. The drilling time is anticipated to be around 25 days. The drilling of LS30-3-1 is part of the 2 well exploration drilling programme by Primeline in 2015 as part of the rolling development programme anchored on the LS36-1 production.

About Primeline Energy Holdings Inc.

Primeline is an exploration and production company focusing exclusively on China natural resources to become a major supplier of gas and oil to the East China market. Primeline has a 100% Contractor’s interest in, and is the operator of, the petroleum contract with CNOOC for Block 33/07 (5,877sq km) and a 49% interest in the producing LS36-1 gas field in Block 25/34, together with CNOOC (51% interest and acting as Operator). Both blocks are located in the East China Sea. LS36-1 has been in production since July 2014. Shares of Primeline are listed for trading on the TSX Venture Exchange under the symbol PEH.

ON BEHALF OF PRIMELINE ENERGY HOLDINGS INC.

“Ming Wang”

Ming Wang

Chief Executive Officer

Please visit the Company’s website at www.pehi.com. Should you wish to receive Company news via email, please email john@chfir.com and specify “Primeline Energy” in the subject line.

Forward-Looking Statements

Some of the statements in this news release contain forward-looking information, which involves inherent risk and uncertainty affecting the business of Primeline. These statements relate to Primeline’s expectation that the drilling of the LS 30-3-1 well will last around 25days. They are based on assumptions (among other things) that operation will be carried out smoothly, and that weather and sea conditions will be favourable for drilling. Although management believes these assumptions to be reasonable. Actual results may vary from those anticipated in such statements. Weather and sea conditions may change. Exploration for oil and gas is subject to the inherent risk that it will not result in a commercial discovery.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Primeline Energy Holdings Inc.
Dr. Ming Wang
CEO
+44 207.499.8888
+44 207.499.2288 (FAX)
Toll Free: +1 877.818.0688
IR@pehi.com

CHF Investor Relations
Cathy Hume
CEO
+1.416.868.1079 x231
Toll Free: +1.877.838.1079 (FAX)
cathy@chfir.com

VSA Capital Limited
Andrew Raca
Head of Corporate Finance
+44 203.005.5000
ARaca@vsacapital.com

CNOOC

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Lotus Creek Exploration Inc. Announces August Operational Update to Shareholders
  • Discount on Western Canada Select widens
  • Alaska LNG could cost more than double Gulf Coast rivals, raising questions over economics
  • B.C.’s Eby promises relief at gas pumps, while Conservative Doerkson praises pipeline
  • ConocoPhillips signs 20-year LNG deal with Venture Global

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.