• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Dakota Protesters Are Facing A New Foe: A Donald Trump Presidency

November 10, 201610:07 AM Chris White0 Comments

Protesters’ recent successes fighting the Dakota oil pipeline could come to a screeching halt once President-elect Donald Trump moves into the White House.

Trump is no doubt a proponent of building pipelines. He dumped nearly $1 million into Energy Transfer Partners, the company constructing the Dakota Access Pipeline, which was disclosed in Trump’s financial filing to the Federal Election Commission.

He has also floated the idea of reviving the Keystone XL line, a Canadian pipeline cutting through the U.S that was eventually scuttled in 2014 by President Barack Obama.

The energy industry believes Trump will be a champion for their cause.

Energy Transfer Partners CEO Kelcy Warren believes a Trump presidency is a good thing for the Dakota pipeline, and underground pipelines in general.

“I view the results of last night’s election as favorable not only for our project, but for future infrastructure projects that have been vetted and reviewed as thoroughly as ours has been,” Warren told reporters Wednesday.

The nearly 1,200-mile long line was initially supposed to run under the Missouri River near the Standing Rock Sioux tribe’s reservation, but demonstrators and environmental activists pushed and prodded the Obama administration into temporarily halting the pipeline.

The company moved the $3.8 billion project south, near the Standing Rock reservation, because it was 11 miles shorter and considered less impactful on the environment, according to the U.S. Army Corps of Engineers. The new pipeline also cost $23 million less than the initial route.

The D.C. Circuit of the U.S. Court of Appeals came to a similar decision on Sept. 17, temporarily halting construction within 20 miles of Lake Oahe in North Dakota while the court considers whether to order a longer delay.

Environmentalists and American Indian groups are rousing.

Standing Rock Sioux Chairman Dave Archambault II told reporters, without specifically mentioning Trump’s name, that the Republican real estate tycoon’s victory shows “that we as a country have so much work to do.”

“We must strengthen our resolve to protect the water, pray together for understanding, and pour our hearts and minds into the future of all our children,” he added.

Environmental groups said they would continue to support the tribe, and are still looking to push Obama to permanently stop the pipeline.

“There is no doubt that Donald Trump poses an immediate threat to our climate and will try to fast track this and other fossil fuel projects across the country,” Greenpeace spokeswoman Lilian Molina said in a statement.

Follow Chris on Facebook and Twitter

Chris White is a contributer for the Daily Caller. This content was provided by the Daily Caller News Foundation

Keystone XL

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Tourmaline announces renewal of normal course issuer bid
  • Japex to buy US tight oil and gas assets for $320 million
  • ConocoPhillips completes $1.7 bln asset sale, hits divestiture target early
  • Paramount Resources Announces Second Quarter 2026 Results, Increased Production Guidance, Sinclair Test Results and Increased Core Land Positions
  • Kelt Reports Financial and Operating Results for the Three Months Ended June 30, 2026

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.