10MMSCFD Sour Gas Facility For Immediate Sale!
Save Millions of Dollars and Months of Time by Installing this Facility – Shut down Only 2 weeks ago!
Quick Points:
- Shut down August 2017 – All Gas has been diverted to a 3rd Party Processor
- The Most Modern Plant on the Market – 26 Million Dollars spent by PennWest in 2012 in upgrading and new construction
- Good Throughput Capacity with room for expansion
- Excellent Condition – Passed detailed mechanical & I/E Inspections in December 16′
- Low Utilization since build out in 2012
- Over 1000 CAD Drawings Already Complete – Massive Engineering Cost Savings
- Complete Documentation and Owner Support
- Located on High Grade Roads for Year Round Access
Equipment Consisting Of:
- Hyrdocarbon Dewpoint Control Building (Consisting of)
- Condensate Treating
- Refrigeration
- Gas Processing / Utility
- Full Measurement
- Glycol Injection
- Amine Sweetening System
- Inlet Separation
- Slug Catchers
- Sour Gas Compression (3 Stage)
- Heat Medium Skid
- 4000AMP MCC Building
- 60,000 Gallon LPG Storage w/ Loadout
- 16” x 150’ Flare Stack and FKOD’s
- Office Building
Asking Price: $7.5 Million Dollars
Rent-To-Own Available
Eliminate Cost Overruns with our Fixed “No Risk” Pricing for Moving, Installation, and/or Commissioning
Also Available Immediately:
2001 30MMSCFD Propak Sweet Refrigeration Facility
c/w 1MW Generator, MCC Building, 6′ x 20′ Inlet Separator, LPG Storage, Flare, Office Building. Already Decommissioned (Late 2016) and Sitting in Truckers yard
Contact Kameron Anderson at kameron@crusaderenergy.ca 403-263-8078 or text at 403-819-3906
Since 2004 Crusader has been serving the oil and gas industry in two primary ways: Delivering good valued, low risk surplus production equipment solutions via our broker and reconditioning project management teams; And by supplying STOCK Water Injection and Disposal Pump systems at a fraction of the cost of new with warranty and full support. Contact us anytime!