• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

National Energy Board Issues three Inspection Officer Orders to Spectra Energy Transmission (Westcoast Energy Inc.)

September 18, 20172:20 PM CNW

CALGARY, Sept. 18, 2017 /CNW/ – The National Energy Board (NEB) has issued three Inspection Officer Orders (Orders) to Westcoast Energy Inc., carrying on business as Spectra Energy Transmission (Westcoast) for the company’s failure to adhere to worker safety, pipe handling and environmental protection requirements during construction activity on the High Pine Expansion Project near Chetwynd, British Columbia.

The new pipeline poses no immediate environmental or public safety concerns.

The NEB Orders were issued on August 24, August 27, and September 13, respectively.

NEB Inspection Officers conducting field inspections observed the following non-compliance matters: unsafe pipe handling, failure to construct bridges over water courses according to specification; failure to protect Riparian Management Areas (environmentally-sensitive areas that occur next to the banks of streams, lakes, and wetlands) from disturbance; and, inadequate sediment, and erosion control measures at all water course crossings.

Additionally, NEB Inspection Officers directed the company to complete 2 specific measures to improve worker safety and environmental protection. These include:

  • investigate unsafe pipe handling activities,
  • assess the adequacy of the High Pine Expansion project oversight, and
  • immediately cease travel on all bridges and ramps that span two watercourses; and
  • submit, for NEB review, company action plans to address management of construction activities.

The NEB takes safety and environmental protection seriously and will not hesitate to take enforcement action regulatory non-compliance. The NEB will closely monitor company compliance with the Inspection Officer Orders.

Quick Facts

  • The High Pine Expansion project was approved for construction in August, 2016. The pipeline moves 240 million cubic feet of natural gas per day to the British Columbia Lower Mainland and into the United States.
  • In 2016, the NEB issued 219 enforcement actions against regulated companies.
  • In 2016 NEB Field Inspectors completed 187 pipeline inspections.
  • The NEB proactively posts its enforcement actions to its external website to keep the public informed.
Advisories & Contact
Associated Links

  • Inspection Officer Order
  • NEB Compliance and Enforcement

The National Energy Board is an independent federal regulator of several parts of Canada’s energy industry. It regulates pipelines, energy development and trade in the public interest with safety as its primary concern. For more information on the NEB and its mandate, please visit www.neb-one.gc.ca.

SOURCE National Energy Board

 

View original content: http://www.newswire.ca/en/releases/archive/September2017/18/c8945.html

Spectra Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Spartan Delta Corp. Announces Second Quarter 2026 Results, Increased 2026 Guidance, and Operations Update
  • Vermilion Energy Inc. Reports Q2 2026 Results, Increases Annual Production Guidance and Enhances Return of Capital Framework
  • Saturn Oil & Gas Inc. Increases 2026 Guidance Following Continued Operational Outperformance, Successful Tuck-In Acquisition Activity and Senior Notes Refinancing
  • Saturn Oil & Gas Inc. Announces Second Quarter 2026 Results with Production Ahead of Guidance and Over $82 Million of Free Funds Flow
  • Whitecap reports record second quarter 2026 financial results and increased production guidance

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.