• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Minnesota public hearings begin for Enbridge’s $6.5 bln oil pipe expansion

September 26, 20175:01 AM Reuters0 Comments

Enbridge pipelineRegulatory hearings for Enbridge Inc’s C$8.2 billion ($6.5 billion) Line 3 crude oil pipeline upgrade will begin on Tuesday in the U.S. state of Minnesota, which presents the last hurdle for the biggest project by North America’s top pipeline operator.

Until mid-November, the Minnesota Public Utilities Commission will hear from groups including landowners, aboriginals and environmentalists, many of whom fiercely oppose the project, while the energy industry supports it.

The commission is not due to make its final decision until next April for Enbridge’s project of replacing its aging pipeline.

The Line 3 replacement project from Hardisty, Alberta, to Superior, Wisconsin, doubles the capacity of the existing line, – which was built in the 1960s and has been running below capacity – to its original 760,000 barrels per day.

The bulk of the line’s U.S. portion passes through Minnesota, the last jurisdiction to review it. A decision to not grant permission would bar work for construction in state, although the company can appeal, and the current line remains operational.

Enbridge spokesman Michael Barnes said: “We are eager for the hearings to get under way and the facts to be presented. This will be a detailed process, which will show the need for the replacement project.”

In a surprise move this month, Minnesota’s Department of Commerce opposed the upgrade, saying refineries in the state and the upper Midwest “are not short of physical supplies of crude oil, and that they have little room to increase total crude runs.”

Producers in Canada’s oil heartland of Alberta, whose landlocked crude trades at a discount to the U.S. West Texas Intermediate benchmark , say they need additional export capacity to attain higher prices.

Aboriginal groups and environmentalist say they are concerned about the potential for leaks and what they say are the project’s contributions to climate change. Further they say, parts of the project involve rerouting, making it akin to a new pipeline than the replacement of an old one.

Enbridge has already begun Line 3 construction in Canada and the state of Wisconsin, where it has obtained all approvals. Enbridge said last month the Line 3 replacement project will cost 9 percent more than its previous forecast, citing in part regulatory delays.

(Reporting by Ethan Lou; Editing by Marguerita Choy)

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Iran will halt attacks as long as US maintains pause, Iranian source says after Trump calls off strikes
  • Five things to watch for in the Canadian business world in the coming week
  • Iran war spreads to Red Sea and Caspian, Gulf quiet as US forgoes strikes
  • Missiles targeting Saudi oil refineries shot down, sources say
  • Kuwait’s KPC signs $16 billion lease and leaseback deal for oil pipeline network

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.