• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

TransCanada asks Montana court to allow preliminary work on Keystone XL

November 27, 20182:49 PM Reuters0 Comments

TransCanada Corp has asked a Montana court to allow it to resume pre-construction activities on its Keystone XL oil pipeline after a U.S. judge blocked construction on the $8 billion project earlier this month.

The Calgary, Alberta-based company has temporarily halted all pre-construction work in the United States on the pipeline project as a result of the ruling, TransCanada spokesman Terry Cunha said on Tuesday.

He added that the company does not expect to start full construction on the 1,180 mile (1,900 km) pipeline until "at least the second half of the first quarter of 2019," but declined to provide further details on timing.

"It is too soon to say what the injunction will mean to the timeline and cost of the Keystone XL pipeline but we remain confident the project will be built," Cunha said.

A U.S. judge in Montana issued an injunction on Nov. 8 blocking construction of the heavy crude pipeline from Canada to the United States, drawing praise from environmental groups and a rebuke from President Donald Trump.

TransCanada has filed an amendment with the Montana District Court to narrow the scope of the injunction to allow it to continue pre-construction work like meetings with stakeholders, the movement of pipe and equipment, and early right-of-way work.

Canada is the No.1 source of oil imported to the United States, but congested pipelines in Alberta, where heavy bitumen is extracted from the oil sands, have forced shippers to use costlier rail and trucks.

Shares of TransCanada closed up 0.72 percent at C$53.50 on Tuesday in Toronto.

(Reporting by Julie Gordon in Vancouver Editing by Phil Berlowitz)

Keystone XL TransCanada

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • How the Democratic sweep could change US energy policy
  • Panama Canal to name shortlisted bidders for terminal project by year-end
  • Canadian companies to benefit as major energy projects move ahead
  • SM Energy may shift drilling in early 2027 amid Uinta Basin constraints
  • Fact File: No evidence for Trump claim Canada will ‘pay for all’ of Keystone pipeline

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.