• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Enbridge urges Canadian regulator to avoid intervening in pipeline plan

September 11, 20192:44 PM Reuters

Enbridge Inc called on Canada’s energy regulator on Wednesday to ignore calls from some of its shippers and avoid intervening in the pipeline company’s contentious proposal to revamp contracts on its Mainline network.

The written submission to the Canada Energy Regulator (CER) is the latest salvo in a dispute between Calgary-based Enbridge and some of Canada’s biggest oil companies over the future of the Mainline network.

The Mainline is North America’s biggest pipeline system and ships the bulk of Canadian crude exports to the United States. It currently allocates capacity according to monthly nominations from shippers, and Enbridge is proposing to switch to long-term fixed-volume contracts on 90% of the pipeline.

Enbridge launched a two-month open season to solicit bids for committed capacity on Aug. 2 but shippers including Canadian Natural Resources Ltd and Suncor Energy complained the terms and tolls on offer were unfair and urged the regulator to intervene in the open season.

The CER agreed to hold a fast-track process to gather comment. Last week 33 interested parties including the Canadian Association of Petroleum Producers waded into the dispute, laying out their support or opposition to Enbridge’s plans.

In its answering letter, Enbridge said the CER should avoid taking the unprecedented step of intervening in a pipeline open season. Instead the CER should stick to the usual practice of holding a regulatory review of the terms and tolls offered, once Enbridge makes a formal application at the end of the year.

By intervening early “this process would delay business, impose considerable regulatory burden on all parties, and require the regulator to micro-manage service offerings,” Enbridge said in the letter.

Enbridge also argued the regulator had no authority to halt the open season, as some shippers have called for. The pipeline company said it had tried to “strike a balance” between its own position and the different positions of stakeholders, some of whom had asked for the Mainline to switch to firm service contracts to give more certainty on capacity and tolls.

Referring to last week’s submissions to the CER, Enbridge said companies that filed letters in support of their proposal ship approximately 30% of crude volumes on the Mainline, while those that filed letters in opposition made up 20% of volumes.

Canadian Natural Resources Enbridge Suncor

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Another European utility looks to lock down supply from Ksi Lisims LNG
  • Germany deepens Canada energy ties with provisional LNG deal
  • Why are the Houthis threatening to attack Red Sea shipping and what does it mean for oil markets?
  • Oil market calm masks a host of unknowns: Bousso
  • Fifth straight rate hold expected as Bank of Canada meets Wednesday

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.