• Sign up for the Daily Digest E-mail
  • Facebook
  • Twitter
  • LinkedIn

BOE Report

Sign up
  • Home
  • Headlines
    • Latest Headlines
    • Columns
    • Discussions
  • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts
    • CAODC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
  • Industry Data
    • Canada Well Licences
    • USA Market Data
    • Data Subscription
  • Jobs

Continuous improvement of the Precision Coil frac technology yields massive results for Yangarra Resources in the Cardium

October 20, 20204:36 AM BOE Report Staff

TWO 2-MILE WELLS, 172+ STAGES ON ONE BHA PER WELL, 4.3 MINUTE AVERAGE CYCLE TIMES, WHILE ACHIEVING 60 STAGES PLACED IN 24 HOURS, WITH OVER 3400 PLUS HIGH RATE TONS PLACED PER WELL.

One of Steelhaus core values is continuous innovation. To this end, our customers will always be collaborative partners, and we rely on their feedback to drive improvement.

Lorne Simpson, Vice president of Yangarra Resources has extensive completions experience in the Cardium including running over 10,000 cemented coil frac sleeves in the Cardium. He has been an essential partner in the continued development of our Precision Coil Frac System.  This partnership recently culminated in a very successful 2 well project in the Cardium.

The program involved over 172 stages per well. Precision achieved several milestones including 60 stages in a 24 hour period, 2 ½ zones per hr for a full 24hrs. The lowest single cycle time of 3.1 minutes per stage with an average of 4.3 minutes total cycle time, and placement of over 3400 tons on a single BHA trip in each well.  Collectively, two 2 mile HZ wells, 347 high rate fracs placing 770 lbs of sand per foot were done in 7 frac days with one BHA per well.

Since Steelhaus’ first well with Yangarra in March 2018 Lorne’s input and involvement has directly contributed to Precision’s ongoing success. Cardium wells are unique and contain a myriad of challenges associated with long lateral length, fluctuating pressure conditions, faults and fractures.

The completion of 58 wells with over 7,000 Precision Coil Frac Sleeves ran for Yangarra since March 2018 provided many collaborative design iterations and trials between Steelhaus and Yangarra which helped improve the Precision Coil Frac System against erosion, cross-flow, and BHA degradation in some of the most challenging frac environments. Previously, sleeve and BHA erosion meant multiple BHA trips would be a reality faced by most service providers.  Steelhaus received a commitment from Yangarra, provided Steelhaus would address all learning opportunities before each new wellbore completion.  Both companies believe in continuous improvement and are committed to finding a single trip BHA solution for their wells.

Cardium Yangarra Resources

Follow the BOE Report
  • Facebook
  • Twitter
  • LinkedIn
Sign up for the BOE Report Daily Digest E-mail
Latest Headlines
  • Canada unveils GHG reduction credits to boost carbon trading market
  • Canada’s weekly rig count drops 5 to 172
  • AER suspends SanLing Energy Ltd.’s operations
  • U.S. drillers add oil and gas rigs for second week in a row
  • Tamarack Valley Energy upsizes previously announced financing

Return to Home
Alberta Gas
CAD/GJ
Market Data by TradingView





    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    Resources
    • App
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contribute
    • Contact
    • Report Error
    Featured In
    • CamTrader
    • Rigger Talk
    Data Partner
    • Foxterra
    BOE Network
    © 2021 Grobes Media Inc.