• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Michigan orders more information from Enbridge on Line 5 tunnel application

July 7, 20223:58 PM Reuters0 Comments

Mackinac Bridge spanning a frozen Straits of Mackinac in Michigan. State of Michigan regulators on Thursday ordered Canada’s Enbridge Inc to file additional information on safety and engineering for its proposed Line 5 oil pipeline tunnel, describing Enbridge’s current application as “deficient.”

Enbridge is planning to build a tunnel beneath the Straits of Mackinac in the Great Lakes to rehouse its existing 540,000 barrel per day Line 5 pipeline.

“The Michigan Public Service Commission (MPSC) today ordered the record reopened in Enbridge Energy LP’s application… finding that the record is deficient on critical matters of engineering and safety, and additional evidence is needed for the Commission to complete its analysis,” regulators said in a statement.

The decision is a setback for Enbridge, which has proposed building the $750-million tunnel to address concerns that Line 5 could spill into the Great Lakes.

A four-mile (6.4-km) section of the aging pipeline runs underwater through the Straits of Mackinac and environmentalists are worried about the risk of an oil leak.

Last year Michigan Governor Gretchen Whitmer ordered Calgary-based Enbridge to shut down Line 5, which ships crude and refined products from Superior, Wisconsin, to Sarnia, Ontario, via Michigan.

Enbridge ignored that order and the two sides are embroiled in a legal battle over the pipeline’s fate.

In a statement Enbridge spokesman Ryan Duffy said the company believes “extensive information documenting the engineering and safety of the Great Lakes Tunnel is already included” in the MPSC record.

“We remain committed to the MPSC process and seeing that the Great Lakes Tunnel is built,” Duffy added.

The Environmental Law and Policy Centre advocacy group said the tunnel was an unnecessary investment in new fossil fuel infrastructure.

“The Commission’s request for additional information makes clear that Enbridge has failed to demonstrate that the tunnel could safely be constructed or operated,” said senior attorney Margrethe Kearney.

Enbridge

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Headwater Exploration Inc. announces second quarter operating and financial results and declares quarterly dividend
  • Ovintiv Reports Second Quarter 2026 Financial and Operating Results
  • Baytex Conference Call and Webcast on Second Quarter 2026 Results to Be Held on July 31, 2026
  • Canadian, U.S. stock markets fall as oil tops US$90 a barrel
  • Keyera Announces Timing of 2026 Second Quarter Results Conference Call and Webcast

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.