The following equipment is for sale and available by heading to https://www.otg.ca/. Each picture and headline is linked for convenience. For any information please feel free to contact Greg Cairns at (780) 806-8700 or greg@otg.ca
- Built in 2015
- 1440 psi MAWP
- 10” gas leg w/SR. Meter Run
- 10” inlet
- Full Drawings and QC available
- Yard stored in Red Deer
- New 30”x10’ 3 phase vessel
- 1440 psi MAWP
- Sweet Service
- Dressed 2 phase
- 3” 600 ansi ESD Valve
- High Level and High Pressure Shutdowns
- 2” liquid dump leg w/turbine and prover taps,
- Fuel gas scrubber
- 24×24 catadyne heater
- 3” 600 ansi Daniels Sr. meter
- 2” 600 ansi D-body BPCV
- 24”x10’ 3 phase vessel
- 1440 psi MAWP
- Sour Service
- Dressed 2 phase
- 3” 600 ansi ESD Valve
- High Level and High Pressure Shutdowns
- 2” liquid dump leg w/turbine and prover taps
- Fuel gas scrubber
- 24×24 catadyne heater
- 3” 600 ansi Daniels Sr. meter
- 2” 600 ansi D-body BPCV
- 24”x10’ 3 phase vessel
- 1440 psi MAWP
- Sweet Service
- Dressed 2 phase
- 3” 600 ansi ESD Valve
- High Level and High Pressure Shutdowns
- 2” liquid dump leg w/turbine and prover taps,
- Fuel gas scrubber
- 24×24 catadyne heater
- 3” 600 ansi Daniels Sr. meter
- 2” 600 ansi D-body BPCV
- 1440 psi MAWP
- Sweet and Sour Service
- Ready to Package
- New 30”x10’ 3 phase vessel
- 1440 psi MAWP
- Sour Service
- Dressed 2 phase
- 3” 600 ansi ESD Valve
- High Level and High Pressure Shutdowns
- 2” liquid dump leg w/turbine and prover taps,
- Fuel gas scrubber
- 24×24 catadyne heater
- 3” 600 ansi Daniels Sr. meter
- 2” 600 ansi D-body BPCV
- 48”x16’ 3 phase vessel
- 1440 psi MAWP
- 10” inlet
- 8” gas outlet
- 3” liquid outs
- Full Drawings and QC Available
- Ready to Package
- 60”x16’ 3 phase vessel
- 1440 psi MAWP
- 10” inlet
- 10” gas outlet
- 3” liquid outs
- Full Drawings and QC available
- Ready to Package
- 36”x10’ Sour 3 phase vessel
- 720 PSI MAWP
- 4” 300 ANSI Full port ESD valve
- High pressure and Highlevel Shutdowns
- 2” Fisher ET back pressure regulator w/ Fisher 4150 controller
- 3” Sr. Meter run w/ Barton 2 pen recorder
- 24”x24” Catadyne explosion proof heater
- Built in 2005
- Drawings Available
- Yard stored in Red Deer
- Built in 2003
- Drawings Available
- 615 PSI MAWP
- Sour Service
- Full drawings and QC available
- Built in 2007
- 320 PSI MAWP
- Spray Foam Insulated
- Drawings Available
- 1440 PSI MAWP
- Gas/Glycol Exchanger
- Wheatly P100 Glycol Circulation Pump
- Particulate and Charcoal Filters
- Air/Glycol Exchanger
- 480,000 BUT Reboiler c/wBMS
- Very clean unit
- Drawings available
- 1440 PSI MAWP
- Built in 2008
- Yard stored in Red Deer
- Drawings available
All equipment is available for immediate sale.