• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Portion of Coastal GasLink construction paused over erosion, sediment control issues

May 9, 202312:35 PM The Canadian Press0 Comments

Coastal Gaslink pipe loading

CALGARY – TC Energy Corp. says it has proactively halted construction on a 20-km stretch of its Coastal GasLink project over concerns about erosion and sediment control.

The Calgary-based pipeline company says the affected section of pipeline is located near the Little Anzac River north of Prince George, B.C.

TC Energy says the region has been affected by challenging spring melt conditions caused by an abundance of snow this winter, a quick spike in temperatures, and heavy rainfall.

The Coastal GasLink pipeline construction project has encountered recurring issues with erosion and sediment control over the past year that have resulted in ongoing compliance and enforcement actions by the B.C. Environmental Assessment Office (EAO).

TC Energy says it made the precautionary decision to pause construction prior to the EAO issuing new stop-work orders on May 4 and 5. The company says it has also launched a third-party review of its erosion and sediment control plans for the area.

The pipeline company says construction is safely progressing along other sections of the 670-km project route, and Coastal GasLink remains on track to be completed by the end of this year.

TC Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US loans 45.2 million barrels of strategic reserve oil in first batch since Iran war
  • Panama Canal operating at top capacity as Iran war triggers more LNG vessel traffic, chief says
  • Iraq cuts Basra oil output to 900,000 bpd from 3.3 million bpd after southern exports halt
  • Kevin Warsh’s first move as Fed chair could be a rate hike: McGeever
  • Iraq declares force majeure on foreign-operated oilfields over Hormuz disruption, sources say

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.