• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

US Mountain Valley natgas pipe moving forward, capacity may be limited

June 23, 20238:07 AM Reuters0 Comments

The $6.6 billion Mountain Valley natural gas pipeline from West Virginia to Virginia is on track to get final permits by Saturday, moving the long-delayed project closer to re-starting construction.

Some analysts, however, said that even when the pipe enters service, which could be as soon as the end of 2023, it would only operate at half capacity or less due to transmission constraints.

Mountain Valley has said it expects to resume construction after the U.S. Army Corps of Engineers issues a water permit. That should happen by Saturday as mandated by the Fiscal Responsibility Act, which ended the debt ceiling crisis.

Officials at Mountain Valley were not immediately available for comment.

Mountain Valley is one of several U.S. projects delayed by regulatory and legal fights with environmental and local groups. The pipe is key to unlocking more gas supplies in Appalachia, the nation’s biggest shale gas basin.

But analysts at energy consulting firm East Daley Analytics said Mountain Valley will only run at about 35% of its 2 billion cubic feet per day (bcfd) capacity when it is finally built.

That’s because the Transcontinental Gas Pipe Line (Transco) system into which Mountain Valley will connect in Virginia has limited takeaway capacity, East Daley said.

Transco is owned by U.S. energy company Williams Cos Inc. Officials at Williams were not immediately available for comment.

Environmental groups, meanwhile, continue to challenge Mountain Valley’s permits in court.

“There is no reason to think they could build and operate this project safely, and now analysts are saying that if (Mountain Valley) is completed, it would only run at less than half capacity,” said Caroline Hansley, senior campaign representative at the Sierra Club, an environmental group opposed to the pipeline.

When Mountain Valley started construction in February 2018, Equitrans Midstream Corp, the lead partner building the project, estimated the 303-mile (488-km) project would cost about $3.5 billion and enter service by late 2018.

Mountain Valley is owned by units of Equitrans, NextEra Energy Inc, Consolidated Edison Inc, AltaGas Ltd and RGC Resources Inc.

(Reporting by Scott DiSavino; Editing by Mark Porter)

AltaGas

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Washington state congressman wants spill response review for Alberta pipeline to B.C.
  • Negotiations between Iran and Oman over Hormuz in final stages, Tehran says
  • Trump says he will hold off on fresh Iran attack in hope of quick deal
  • Tanker struck by projectile off Oman, UKMTO says
  • Full stoppage of CPC not under consideration, Kazakh energy ministry says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.