• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Trans Mountain says British Columbia fires pose no risk to its operations

August 20, 20233:39 PM Reuters0 Comments

Canadian oil pipeline system operator Trans Mountain said on Sunday that the British Columbia wildfires posed no risk to its pipeline operations or its expansion project.

“Trans Mountain is actively monitoring the wildfire situation and we are in constant communication with local and provincial agencies, including Indigenous communities,” Trans Mountain said in a statement.

The province imposed an emergency late on Friday, giving officials more power to deal with fire risks. By Saturday, more than 35,000 residents were under an evacuation order and another 30,000 were under an evacuation alert.

Trans Mountain said that they maintain several wildfire equipment trailers and caches of equipment that allows for the safe construction and operation of the pipeline adding that underground pipelines are buried a few feet below the surface and are protected from the fire by the soil and constant movement of liquid moving through the pipelines.

Prime Minister Justin Trudeau’s Liberal government bought the Trans Mountain pipeline in 2018 from Kinder Morgan Inc to ensure the expansion project got built and provided a C$10 billion($7.38 billion) loan guarantee to TMC.

It is meant to unlock Asian markets for Canadian oil, which is mostly exported to the United States now. But the project has been hampered by regulatory obstacles, environmental opposition, and construction delays, and is now anticipated to cost C$30.9 billion, more than quadrupling the C$7.4 billion budgeted in 2017.

(Reporting by Gokul Pisharody and Kanjyik Ghosh in Bengaluru Editing by Matthew Lewis and Diane Craft)

Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Tired of chaos, investors retreat from oil market at record pace
  • Lost Gulf oil exports far smaller than thought, traders and shippers say
  • Exxon Mobil evaluates potential buyout of Australia Woodside Energy, Bloomberg News reports
  • Chevron continues to look at new opportunities in Middle East, CEO says
  • Asia spot LNG at 11-week high as Middle East tensions and hot weather drive demand

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.