• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Exxon proposes sixth oil project in Guyana for $12.9 billion

August 21, 202311:30 AM Reuters0 Comments

Exxon Mobil Corp and partners plan to spend $12.93 billion to develop their sixth offshore oil project in Guyana, according to a filing published on Monday by the South American country.

The floating production platform for the so-called Whiptail project would start operations in 2027 and bring the Exxon-led consortium’s oil output in Guyana over 1.2 million barrels per day (bpd).

Guyana has emerged as the world’s fastest-growing new oil province in a decade with discoveries of more than 11 billion barrels of oil and gas. Exxon and partners Hess Corp and CNOOC Ltd now produce 400,000 bpd from two vessels and have said they could develop up to 10 offshore projects.

Their production has brought $2.8 billion in direct revenue to Guyana and led to work for some 4,400 Guyanese.

The Whiptail project outlined in the Environmental Impact Analysis made public on Monday by the government is similar to Exxon’s fifth project – Uaru – with output of 250,000 bpd and an upper production limit of 263,000 bpd. Exxon, Hess and CNOOC committed to spending $12.7 billion for Uaru earlier this year.

The project does not plan to produce natural gas because studies indicated that any reduction in injected gas would result in reduced oil recovery, the filing said.

The partners plan to drill up to 72 wells with development drilling scheduled from late 2024 through mid-2030. Installation of subsea components would begin in the second half of 2025 or early 2026, according to Exxon.

The project is expected to employ up 540 people during the drilling and installation stage and from 100 to 180 people during production operations, Exxon said in the document to Guyana’s Environmental Protection Agency (EPA).

(Reporting by Kiana Wilburg, writing by Sabrina Valle, editing by Deepa Babington)

CNOOC Exxon Mobil

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Tanker struck by projectile off Oman, UKMTO says
  • Full stoppage of CPC not under consideration, Kazakh energy ministry says
  • Exxon, Chevron warn of continued high fuel prices from Iran war
  • ROK Resources Announces the Closing of its Non-Core Southeast Saskatchewan Asset Disposition
  • Chevron records highest quarterly profit in six years, beating analyst estimates

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.