• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Canada regulator wraps up hearing on Trans Mountain pipeline variance request

January 12, 20241:33 PM Reuters0 Comments

Trans Mountain pipeline The Canada Energy Regulator (CER) on Friday said it would issue a decision on a variance request from the Trans Mountain pipeline expansion project “in due course,” following a one-day oral hearing in Calgary.

Trans Mountain has asked to be allowed to install smaller-diameter pipe in a 1.4-mile (2.3-km) section of the oil pipeline’s route after encountering “very challenging” drilling conditions due to the hardness of the rock in a mountainous area between Hope and Chilliwack.

The CER denied that request on Dec. 5, prompting Trans Mountain to then ask the regulator to reverse the decision on the grounds it could cause a “catastrophic” two-year delay and billions of dollars in losses.

During Friday’s oral hearing, the CER asked Trans Mountain to address outstanding questions about the quality of materials it intended to use for the smaller section of pipe and how it would conduct inspections within the pipeline.

Tran Mountain’s lawyer Sander Duncanson urged the CER to make a decision on the variance request quickly. The long-delayed project is meant to start operating by the end of March.

“Every day of delay in this installation will likely delay the ultimate in-service date for the project. Every week of delay…will cost Trans Mountain alone approximately C$50 million ($37.30 million),” Duncanson said.

The C$30.9-billion Trans Mountain expansion will nearly triple the flow of crude from Alberta to Canada’s Pacific Coast but has been plagued by years of regulatory delays and massive cost over-runs.

Prime Minister Justin Trudeau’s Liberal government bought the pipeline in 2018 to ensure the expansion, intended to open up Asian refining markets to Canadian producers, went ahead.

Concerns about further delays and the variance request being rejected have weighed on Canadian heavy crude prices in recent months.

(Reporting by Nia Williams; Editing by Leslie Adler and Franklin Paul)

Trans Mountain Pipeline

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Crude oil futures are pricing market adaptability, not hopeful Iran peace: Russell
  • Saturn Oil & Gas Inc. Announces Completion of the Offer for the Common Shares of Burgess Creek Exploration Inc. and Mandatory Extension Period to August 6, 2026
  • Ukraine’s attacks on Russian energy sites — what has been hit?
  • Europe faces a long, cold winter as fuel buffers dwindle: Bousso
  • Iran says it still controls strait, not seeking talks, after Trump halts bombing

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.