• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Equipment shortages add pressure to LNG plant costs, Kiewit says

September 19, 202412:45 PM Reuters0 Comments

The boom in U.S. construction of liquefied natural gas (LNG) plants has led to shortages of generators, electric motors and transformers, contributing to higher costs and construction delays, Kiewit Energy President Tom Shelby said on Thursday.

Equipment shortages and rising costs for equipment, wages and cement have driven up the cost of constructing new LNG plants by between 25% and 30% over the last five years, Shelby said, noting that wages have increased by 20% in keeping with inflationary costs.

Kiewit, among the largest U.S. contractors, has been involved in building LNG plants including Venture Global’s 12 million tons per annum (MTPA) plant at Calcasieu Pass, Louisiana.

“For most of my career transformers from order to supply took one year. Now, it’s up to nearly two years,” Shelby told Reuters on the sidelines of the Gastech conference in Houston.

Separately, energy researcher Wood Mackenzie said fees LNG developers charge new customers to liquefy gas have been climbing.

Twenty-year gas processing deals signed in 2022 and early 2023 were priced between $2.15 per million British thermal units and $2.30/mmBtu. More recent deals have put tariffs in the $2.40/ mmBtu to $2.50/mmBtu range, Wood Mackenzie said.

Equipment availability can no longer be taken for granted, and shortages have been compromising quality.

“It affects us as an EPC (engineering, procurement and construction) contractor in terms of the quality and the time,” said Shelby.

There are five LNG plants under development in Texas and Louisiana and 16 others on the drawing board looking to secure investment and customers. The five under construction would add a combined 86.6 million metric tons per annum (MTPA) of the superchilled gas.

Work at Golden Pass LNG, one of the largest U.S. projects, largely halted after its main contractor ran $2.4 billion over the original budget and filed for bankruptcy earlier this year. The project’s joint owners, QatarEnergy and Exxon Mobil, recently asked for a three year extension to their construction permit.

(Reporting by Curtis Williams in Houston; Editing by David Gregorio)

Exxon Mobil LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select widens
  • European Commission proposes Russian oil price cap 15% below global price
  • US oil/gas rig count down for 11th week to lowest since 2021, Baker Hughes says
  • Taiwan’s CPC Corp eyes US shale gas assets, sources say
  • Saudi Arabia complying fully with voluntary OPEC+ target, energy ministry says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2025 Stack Technologies Ltd.