• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Texas approves plan to boost oil and gas drillers’ power grid access

September 26, 20242:13 PM Reuters0 Comments

A Texas commission unanimously on Thursday approved the Permian Basin Reliability Plan, which is designed to expand power grid infrastructure in the United States’ largest oilfield to accommodate rapidly growing demand from the oil and gas industry.

The Public Utility Commission of Texas (PUCT) directed the Electric Reliability Council of Texas (ERCOT) to compile the plan in December last year, two months after ConocoPhillips, ExxonMobil, Pioneer Natural Resources (PXD.N), Diamondback, Chevron and Devon Energy submitted a report with financial information company S&P Global warning the commission of a significant increase in electric load demand in the Permian basin in the coming years.

CONTEXT

Electrifying oilfield operations can reduce emissions and eliminate pollution and noise associated with diesel-powered rigs and fracking equipment.

The Texas power grid has come under significant strain, with the state home to some of the most energy-intensive industries, including data centers, cryptocurrency mining and oilfield operations.

Surging population growth and sweltering heat have also increased stress on Texas’ vulnerable electrical grid, last month driving demand to a record high.

Around 29% of surveyed respondents who had participated in the latest Dallas Fed Energy Survey said uncertainty about grid access was a top challenge to electrifying their operations.

Another quarter of those polled primarily cited grid infrastructure challenges as a hurdle to electrification.

BY THE NUMBERS

ERCOT, which operates most of the state’s power grid for 27 million customers, forecasts electricity demand in the Permian Basin could grow to nearly 27 gigawatts by 2038, equal to almost a third of the current summer demand of the entire ERCOT system, according to ERCOT.

ERCOT estimates that the required transmission upgrades to meet the jump in demand could range between $12.95 billion and $15.32 billion.

KEY QUOTE

“Ensuring the Permian Basin has the reliable electricity it needs to power Texas’ world-leading oil and gas industry is a top priority for the Commission, and we have taken swift action to direct ERCOT to develop a transmission infrastructure plan for the region,” PUCT Commissioner Lori Cobos said.

(Reporting by Georgina McCartney in Houston; Editing by Chizu Nomiyama)

Chevron ConocoPhillips

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Obsidian Energy Announces Closing of $75 Million Add-On to Our Senior Unsecured Notes
  • North Dakota oil production down 16,000 bpd in May vs April to 1,125,000 bpd – state regulator
  • QatarEnergy prepares to extend force majeure on LNG into mid-October, Bloomberg News reports
  • North America has plenty of natural gas. And yet the outlook may be more volatile than ever.
  • Iran’s Qalibaf says no one will sell oil in the region if Iran cannot

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.