• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

LNG Canada prepares plant for first production in June, sources say

May 5, 20253:58 PM Reuters0 Comments

LNG Canada has completed the cooldown of its liquefied natural gas plant in Kitimat, British Columbia, and is preparing for the plant to produce its first LNG in June, two people familiar with the process told Reuters.

Cooling an LNG plant to test how its machinery expands and contracts is a critical step to ensuring the safe production of the super-chilled gas and critical step prior to beginning operations.

LNG Canada is the country’s first LNG export facility and when completed is expected to produce 14 million metric tonnes per annum (MTPA) for export.

LNG Canada confirmed that the Maran Gas Roxana, which on April 1 brought a shipment of LNG to the plant, departed on Saturday.

“The LNG was required for equipment testing and cool down of the facility, which is critical for our commissioning and safe start-up process in advance of operations,” LNG Canada said on Monday.

LNG Canada started flaring in April and said it will continue into May. Flaring will occur while systems are tested, LNG Canada said.

“We anticipate the flare height will vary between approximately 20 meters and 50 meters (65-164 ft) until May 15,” LNG Canada said in a notice.

Once operational, the plant will give Canadian energy firms another outlet for their production, facilitating sales to other countries. For now, the U.S. is the only outlet for Canadian gas.

Canada exported about 8.6 billion cubic feet per day (bcfd) of gas via pipelines to the U.S. in 2024, up from 8.0 bcfd in 2023 and an average of 7.5 bcfd between 2018 and 2022, according to data from the U.S. Energy Information Administration.

LNG Canada is a joint venture of Shell, Petronas, PetroChina, Mitsubishi Corporation and Kogas.

(Reporting by Curtis Williams in Houston; Editing by Liz Hampton and Marguerita Choy)

LNG PetroChina Petronas Shell

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Some things never change
  • Trump says Iran has taken too long to negotiate, will ‘pay the price’
  • US working to release energy reserves, boost sales of gas to ASEAN
  • CSV Midstream Solutions Announces Proposed Fractionation Facility in Alberta’s Industrial Heartland
  • New oil and gas jobs from BOE Report Jobs

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.