• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

How Canada’s wildfires are affecting oil supply

June 3, 202511:19 AM Reuters0 Comments

Wildfires burning in Canada’s oil-producing province of Alberta have reduced the country’s daily crude production by about 7%. Here is a tally of affected oil production sites so far:

CENOVUS ENERGY – CHRISTINA LAKE SITE:

Oil sands producer Cenovus evacuated non-essential workers from its Christina Lake site south of Fort McMurray, Alberta on May 29 and began shutting in approximately 238,000 barrels per day of production. The company said it is not aware of any damage to its infrastructure and expects a full restart of the site in the near term.

CANADIAN NATURAL RESOURCES – JACKFISH LAKE:

Canada’s largest oil and gas producer said on May 31 it had evacuated workers from its Jackfish 1 thermal in situ operations south of Fort McMurray, Alberta and completed the safe, temporary shut-in of approximately 36,500 bpd of bitumen production.

MEG ENERGY – CHRISTINA LAKE REGIONAL PROJECT:

Oil sands company MEG said on May 31 it had evacuated non-essential personnel from its Christina Lake regional project site south of Fort McMurray. The company said the wildfire damaged a power line connecting the project to Alberta’s electricity grid, which was delaying the planned startup of MEG’s phase 2B operations. They represent approximately 70,000 bpd of production.

(Reporting by Amanda Stephenson in Calgary)

Canadian Natural Resources Cenovus MEG Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Tanker loaded with Iraqi crude passes through Hormuz, shipping data shows
  • Israel preparing for attacks on Iranian energy sites, awaits US green light, official says
  • Iran says Iraq exempt from any Strait of Hormuz restrictions
  • India makes first Iranian oil buy in seven years with no payment problems
  • Five EU countries call for windfall tax on energy companies

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.