• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Texas firm aims to build world’s largest data energy complex with nuclear, gas, solar

June 26, 20252:35 PM Reuters0 Comments

Fermi America, a Texas company co-founded by former U.S. Energy Secretary Rick Perry, aims to build the largest energy and data complex of its kind powered by nuclear, natural gas and solar, it said on Thursday.

Fermi plans to partner on the “Hypergrid” project with Texas Tech University and said it will be launched on July 4.

Perry, who also served as Texas governor, said that China is building 22 nuclear reactors while the U.S. is building none.

“We’re behind – and it’s all hands on deck. We need to be doing everything in our power to win this race, because this is the race that really matters.”

Interest in building new nuclear plants has spiked after President Donald Trump issued executive orders last month that aim to fast track applications for new reactors and overhaul the Nuclear Regulatory Commission.

Nuclear critics and some proponents have criticized the overhaul as potentially detrimental to the industry and putting politics ahead of safety and public health. Trump this month also fired Democratic NRC commissioner Chris Hanson.

Fermi said the Amarillo campus has the potential to deliver up to 11 gigawatts (GW) of new nuclear, gas and solar power, about enough for more than 8.2 million homes, with 1 GW expected online by late 2026. It did not say how much the project would cost or how it is being financed.

Fermi said the project will be the largest U.S. nuclear power complex, but did not say when it would be completed. U.S. nuclear power has been plagued by delays and cost overruns, with the last reactor coming online last year in Georgia.

The last two reactors completed in Vogtle, Georgia, cost a total of more than $30 billion, according to the U.S. Energy Information Administration

The NRC said it is reviewing applications from Fermi which should be public soon. The Washington Post said the project has applied for four 1-GW nuclear reactors. Fermi did not immediately confirm that.

The nearly 5,800-acre (2,347-hectare) campus will also have capacity for large artificial intelligence data centers.

The site, near the Department of Energy’s Pantex nuclear weapons plant, “underscores Fermi’s strategic position to build clean, safe, new nuclear power for America’s next-generation AI,” Fermi said.

The site is also situated near some of the largest U.S. gas pipelines and atop a large natural gas field.

(Reporting by Timothy Gardner Editing by Marguerita Choy)

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Trans Mountain Releases Annual Sustainability Report
  • Baytex Announces Renewal of Normal Course Issuer Bid
  • US refining capacity fell by 263,000 barrels per day in 2025, says EIA
  • US energy firms add most rigs in a week since June 2022, Baker Hughes says
  • US diesel refining economics remain firm despite Iran war truce

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.