• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

How Germany is building up LNG import terminals

August 28, 20254:28 AM Reuters0 Comments

Germany is putting into operation a second liquefied natural gas import terminal, the latest step in its effort to replace piped Russian gas since Moscow’s invasion of Ukraine in 2022.

Its first move has been to deploy floating storage regasification units (FSRUs) to receive seaborne LNG, while in the longer term it is planning shore-based regasification terminals and facilities to import and produce ammonia and green hydrogen.

Here are details of the latest developments:

MUKRAN

The terminal on Ruegen island in the Baltic Sea supplies onshore grids with LNG via pipeline firm Gascade’s link OAL, via the Neptune vessel operated by Norway’s Hoegh Evi.

ReGas says it is relying on EU decisions to extend requirements to refill underground storage facilities.

In long-term arrangements, ReGas has launched a bidding round to expand Mukran’s capacity by offering an additional 5 bcm per year from 2027 to 2043.

It wants to restart a second FSRU eventually and restore full capacity of 13.5 bcm by 2027.

S%P Global Platts has added Mukran as a discharge port in its delivered ex-ship (DES) Northwest Europe LNG benchmark prices assessment as from Sept. 16, ReGas said this month.

LUBMIN

ReGas and Hoegh plan to develop the Baltic Sea port, a forerunner of Mukran, into an ammonia/hydrogen import terminal, which Gascade will link up with customers, once it goes ahead.

WILHELMSHAVEN

Utility Uniper launched Germany’s first FSRU operation, Wilhelmshaven 1 on the North Sea, in 2022.

Uniper plans to add a land-based ammonia import reception terminal and cracker in the second half of this decade to make green hydrogen, and build a 200 MW electrolyser to be fed with local wind power.

DET will officially start commercial operations at Wilhelmshaven 2 on Friday, via the Excelerate Energy-operated FSRU Excelsior, following preparatory and testing activities since May.

All available regasification slots in 2025 and 2026 were placed with gas market players last month.

STADE

Hanseatic Energy Hub (HEH) in 2024 took a final investment decision for a land-based, ammonia-ready terminal at the Elbe river inland port to start in 2027.

The terminal is expected to cost about 1 billion euros ($1.17 billion).

Employment of the FSRU Energos Force, which was expected to run until 2027 ahead of the onshore terminal starting operations, has been delayed until further notice after DET and HEH cancelled contracts with each other over still unresolved disputes on construction schedules and payments.

BRUNSBUETTEL

The Brunsbuettel FSRU went into operation in 2023 on the North Sea coast, initially chartered and operated by the trading arm of utility RWE before it was handed over to DET.

It is the forerunner of a land-based LNG facility cleared to receive 40 million euros of state support.

It could start operations at the end of 2026, when a newly inaugurated, adjacent ammonia terminal could also start up. ($1=0.8542 euros)

(Reporting by Vera Eckert, Editing by Clarence Fernandez)

LNG

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Trump says the US has swept Strait of Hormuz for mines
  • Oil stocks in US Strategic Petroleum Reserve fall by 6.1 million barrels to lowest level since 1983
  • US natgas prices climb 4% as LNG export flows hit one-month high
  • China is balancing Asia’s crude oil demand by itself: Russell
  • Rubellite Energy Corp. reports second quarter 2026 financial and operating results, and provides operations and 2026 guidance update

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.