• Sign up for the Daily Digest E-mail
  • Facebook
  • X
  • LinkedIn

BOE Report

Sign up
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Completion Superintendant Powers Wireline Units With Own Fuel Gas

November 21, 20255:55 AM BOE Report Staff

Calgary, AB – A Tier 1 Operator in the Canadian Energy Industry has started powering Electric Wireline Units with their own Fuel Gas onsite. The 140kw E-Line Units (2 of them) displaced over $1000/day in diesel as part of the Operator’s Pad Electrification strategy to reduce costs. The Operator continued phasing in Pad Electrification by plugging in lights, shacks, minions, job trailers, BOP accumulators, and the datavan for savings of more than $5000/day on the pad.

The intangible savings analyzed by the Operator included the elimination of skid steer man hour refuelling, maintenance, servicing, noise, carbon taxes, and emissions. By centralizing their power and gas supply, it gave the Operator better oversight and internal controls when it comes to tracking costs.

The Pad Electrification strategy includes utilizing fuel gas supplied turbines either individually or paired together to form a micro grid ranging from 200kw to 2.5MW of reliable power. Multiple third-party diesel generators can be displaced with one Evolution Power turbine. Power can be conveniently and safely distributed throughout site with a plug and play cabling and distribution system (referred to as the “Micro Grid”). The turbines, distribution panels, transfer switches, and cabling system are all incorporated into the site plan for ease of access and only require 5 hours of service per year. In water management applications, Operators are switching away from diesel power generation at primary water sources to power fracs and heat reservoirs, amongst other Upstream and Midstream uses.

A critical component to Pad Electrification success lies within the turbine fuel tolerances. Fuel gas (solution/well gas), natural gas, sales gas, wet gas, dry gas, propane, and sour gas (up to 5,000 ppm H2S content) can be utilized to create power. Once the gas analysis is reviewed, a decision can be made whether treatment of the gas is needed. If gas treatment is needed, a Pressure Reduction Skid, Knock Out/Knock Down tank, or Vaporizer can be used. Pads can be electrified to power Drilling, Completion, Production, and Construction operations. For more information contact Michael.lawson@enterprisegrp.ca.

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Discount on Western Canada Select steadies
  • BP has no plans to honor the national oil bargaining agreement, union says
  • Petrus Resources Announces Monthly Activity Update
  • US oil production, demand fell to multi-month lows in November, EIA data shows
  • US drillers add oil and gas rigs for third week in a row, says Baker Hughes

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.