• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

What you need to know about restarting an Alberta oilsands project

May 17, 20162:26 PM The Canadian Press0 Comments

CALGARY – Wildfires at Fort McMurray, Alta., have forced the shutdown of about a dozen mining and thermal projects.

Here’s what you need to know about how they will be restarted and how long that might take.

What is the difference between an oilsands mine and a thermal oilsands project?

An oilsands mine recovers heavy, sticky bitumen crude from a strip mine using shovels and trucks and then processes the ore to remove impurities such as sand, clay and water. Most miners also upgrade the bitumen to make a more valuable light “synthetic oil” product to be shipped to a refinery.

A thermal project uses wells into which steam is injected to melt the bitumen and allow it to be pumped to the surface. New thermal projects take many months to reach full production because an underground “steam chamber” has to be created in each well to ensure an even flow of bitumen.

What happens when power and heat are removed suddenly?

The short answer is that all the bitumen, whether in the upgrader or deep in a thermal operation’s well, begins to revert to a product that can be as solid as a hockey puck at cool spring temperatures. In short, it can gum up the works.

Rob Bedin, a director at RS Energy Group in Calgary, said a careful shutdown will result in bitumen being cleaned out of vessels and pipes throughout a mine’s upgrader, while a thermal oilsands project operator will ensure the steam chamber remains heated or will inject solvents to keep the bitumen as liquid as possible.

Producers shut down plants and wells for maintenance or to comply with regulated inspections, often annually or semi-annually.

How long will it take to get the projects operating again when the fires are extinguished?

Mining: The physical gathering of bitumen ore at surface can be restarted as soon as the trucks and shovels have drivers. But processing and upgrading systems need to be started more gradually, Bedin says. A project that has been properly shut down and kept warm could be ramping up in about a week. A cold upgrader could require two weeks or more.

Thermal projects: Usually take longer to return to full production, perhaps three weeks, because steam has to be re-established in a network of surface supply lines leading to what could be dozens of wells, Bedin says. The ramp-up of production of bitumen will be gradual, depending on how much steam is available as well as the operation of pumps, valves and other gear.

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • New oil and gas jobs from BOE Report Jobs
  • About half of Venezuela oil output now goes to US, Under Secretary Haustveit says
  • Canada’s oil producers target late 2027 for Pathways carbon capture decision
  • Trump says no talks are taking place with Iran and none are scheduled
  • Idemitsu starts sourcing Saudi crude via Suez route, sees no risk to stable supplies -president

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.