• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

NEB inspectors cite Enbridge’s B.C. pipeline expansion construction failures

September 18, 20173:17 PM The Canadian Press0 Comments

CALGARY – The National Energy Board is ordering a subsidiary of Enbridge Inc. (TSX:ENB) to take measures to improve worker safety and environmental protection after several infractions were spotted during field inspections of a B.C. pipeline expansion project.

The agency says it issued three orders to Spectra Energy Transmission concerning construction of its High Pine natural gas pipeline expansion project near Chetwynd, B.C.

The NEB says the new pipeline poses no immediate environmental or public safety concerns.

The company is cited for failure to construct bridges over watercourses according to specification, failure to protect environmentally sensitive areas near streams, lakes and wetlands from disturbance, and inadequate sediment and erosion control measures at watercourse crossings.

The NEB inspectors ordered the company to complete 27 measures. These included halting unsafe pipe handling activities, assessing the adequacy of project oversight, immediately ceasing travel on bridges and ramps that span two watercourses, and submitting company action plans to address management of construction activities.

The expansion project was approved a year ago. The pipeline moves 240 million cubic feet of natural gas per day to the British Columbia Lower Mainland and into the United States.

Enbridge Spectra Energy

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • Obsidian Energy Announces New Asset-Based Organizational Structure with Heavy Oil and Light Oil Teams
  • Whitecap Resources Inc. confirms monthly dividend for November 2026 of $0.0617 per share
  • Discount on Western Canada Select widens
  • Chevron closes in on $5 billion Beacon deal, FT reports
  • Countries willing to pay more for stable energy supply from Canada, Hogan says

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    StackDX
    • BOE Report Jobs
    • StackDX Intel
    © 2026 Stack Technologies Ltd.