• Sign up for the Daily Digest E-mail
  • X
  • LinkedIn
  • See more results

    Generic selectors
    Exact matches only
    Search in title
    Search in content
    Post Type Selectors

BOE Report

Sign up

See more results

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
  • Home
  • StackDX Intel
  • Headlines
    • Latest Headlines
    • Featured Companies
    • Columns
    • Discussions
  • Well Activity
    • Well Licences
    • Well Activity Map
  • Property Listings
  • Land Sales
  • M&A Activity
    • M&A Database
    • AER Transfers
  • Markets
  • Rig Counts/Data
    • CAOEC Rig Count
    • Baker Hughes Rig Count
    • USA Rig Count
    • Data
      • Canada Oil Market Data
      • Canada NG Market Data
      • USA Market Data
      • Data Downloads
  • Jobs

Imperial Oil’s Kearl oilsands tailings plan wins conditional AER approval

July 16, 201811:53 AM The Canadian Press0 Comments

CALGARY – The Alberta Energy Regulator has conditionally approved a tailings pond management plan for the five-year-old Kearl oilsands mine in northern Alberta.

The plan is the sixth since last fall to win interim approval despite the regulator’s reservations about the applicants’ ability to remediate the lakes of contaminated water created in the oilsands mining process.

The AER says in its Kearl decision that it has concerns with whether operator Imperial Oil Ltd.’s assumptions about its treatment technology performance will match actual results as oilsands ore is mined until 2056.

It also says the company’s end-of-mine-life target appears to be greater than the maximum allowed five years of fluid tailings production and it must therefore provide an updated tailings profile by the end of 2020.

The AER also ordered Imperial to submit an alternative to its tentative plan to cover 125 billion litres of untreated fluid tailings with a water cap, as the regulator has not approved the use of that technique.

Oilsands mining companies were ordered in 2015 to submit plans to progressively treat and reduce tailings over the life of each project, with all fluid tailings ready to reclaim within 10 years of the end of mine life.

Imperial Oil

Follow BOE Report
  • Facebook
  • X
  • LinkedIn

Sign up for the BOE Report Daily Digest E-mail

Successfully subscribed

Latest Headlines
  • US natgas falls 4% to 8-week low on milder weather outlook, lower LNG export flows
  • Iran has asked to continue talks and the US agreed, Trump says
  • Keeping cool: How Meta plans to cut down on water use at its Alberta data centre
  • Tanker traffic slows in Strait of Hormuz after US and Iran clashes
  • Prime Minister of Canada Mark Carney and the Crown Prince and Prime Minister of Saudi Arabia, His Royal Highness Mohammed bin Salman commit to deepening bilateral engagement and economic cooperation

Return to Home
Alberta GasMonthly Avg.
CAD/GJ
Market Data by TradingView

    Report Error







    Note: The page you are currently on will be sent with your report. If this report is about a different page, please specify.

    About
    • About BOEReport.com
    • In the News
    • Terms of Use
    • Privacy Policy
    • Editorial Policy
    Resources
    • Widgets
    • Notifications
    • Daily Digest E-mail
    Get In Touch
    • Advertise
    • Post a Job
    • Contact
    • Report Error
    BOE Network
    © 2026 Stack Technologies Ltd.